11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table B1.1 - Base <strong>Costs</strong> Obtained from the <strong>Water</strong> Model <strong>for</strong> Activated AluminaCost ComponentContactor Volume (ft3)Capital Cost32 71 126 283 385 502 754 CategoryExcavation & Sitework $4,700 $4,700 $4,700 $4,700 $4,700 $4,700 $4,700 cManufactured Equipment $12,800 $23,900 $39,100 $50,600 $64,500 $72,900 $101,000 pActivated Alumina $1,400 $3,100 $5,400 $11,900 $15,400 $19,600 $29,400 pConcrete $400 $1,200 $1,800 $2,000 $2,500 $3,200 $4,100 pLabor $1,200 $1,500 $2,000 $2,800 $3,300 $3,400 $4,200 cPipes <strong>and</strong> Valves $5,200 $6,500 $6,500 $8,400 $12,800 $13,300 $20,100 pElectrical $6,400 $6,400 $6,400 $8,000 $8,000 $8,500 $9,600 pHousing $8,700 $14,400 $16,900 $17,900 $24,800 $34,400 $43,900 pSubtotal $40,800 $61,700 $82,800 $106,300 $136,000 $160,000 $217,000Contingencies $6,100 $9,300 $12,400 $15,900 $20,400 $24,000 $32,600 cTotal $46,900 $71,000 $95,200 $122,200 $156,400 $184,000 $249,600Table B1.2 - <strong>Water</strong> Model Base Construction Cost Analysis <strong>for</strong> Activated AluminaCost Component32 71 126Contactor Volume (ft3)Average283 385 502 754 PercentExcavation & Sitework 10.02% 6.62% 4.94% 3.85% 3.01% 2.55% 1.88% 4.70%Manufactured Equipment 27.29% 33.66% 41.07% 41.41% 41.24% 39.62% 40.46% 37.82%Activated Alumina 2.99% 4.37% 5.67% 9.74% 9.85% 10.65% 11.78% 7.86%Concrete 0.85% 1.69% 1.89% 1.64% 1.60% 1.74% 1.64% 1.58%Labor 2.56% 2.11% 2.10% 2.29% 2.11% 1.85% 1.68% 2.10%Pipes <strong>and</strong> Valves 11.09% 9.15% 6.83% 6.87% 8.18% 7.23% 8.05% 8.20%Electrical 13.65% 9.01% 6.72% 6.55% 5.12% 4.62% 3.85% 7.07%Housing 18.55% 20.28% 17.75% 14.65% 15.86% 18.70% 17.59% 17.62%Contingencies 13.01% 13.10% 13.03% 13.01% 13.04% 13.04% 13.06% 13.04%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 B-1February 1999<strong>Water</strong> Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!