11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table C19.1 - Base <strong>Costs</strong> Obtained from the WATERCO$T Model <strong>for</strong> Rapid Mix, G=900Cost ComponentBasin Volume (ft3)Capital Cost100 500 1,000 5,000 10,000 20,000 CategoryExcavation & Sitework $220 $380 $490 $1,360 $2,720 $5,460 cManufactured Equipment $4,310 $9,830 $14,760 $66,840 $133,670 $267,340 pConcrete $390 $870 $1,280 $3,610 $7,220 $14,450 pSteel $570 $1,350 $2,010 $5,600 $11,180 $22,360 pLabor $1,230 $2,300 $3,410 $13,140 $26,280 $52,550 cElectrical $6,980 $6,980 $7,180 $7,470 $8,760 $16,100 pContingencies $2,060 $3,260 $4,370 $14,700 $28,470 $56,740 cTotal $15,760 $24,970 $33,500 $112,720 $218,300 $435,000Table C19.2 - WATERCO$T Model Base Construction Cost Analysis <strong>for</strong> Rapid Mix, G=900Cost ComponentBasin Volume (ft3)Average100 500 1,000 5,000 10,000 20,000 PercentExcavation & Sitework 1.40% 1.52% 1.46% 1.21% 1.25% 1.26% 1.35%Manufactured Equipment 27.35% 39.37% 44.06% 59.30% 61.23% 61.46% 48.79%Concrete 2.47% 3.48% 3.82% 3.20% 3.31% 3.32% 3.27%Steel 3.62% 5.41% 6.00% 4.97% 5.12% 5.14% 5.04%Labor 7.80% 9.21% 10.18% 11.66% 12.04% 12.08% 10.50%Electrical 44.29% 27.95% 21.43% 6.63% 4.01% 3.70% 18.00%Contingencies 13.07% 13.06% 13.04% 13.04% 13.04% 13.04% 13.05%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 C-19February 1999W/W Cost Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!