11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table B13.1 - Base <strong>Costs</strong> Obtained from the <strong>Water</strong> Model <strong>for</strong> Sodium Hydroxide FeedCost ComponentMaximum Feed Rate (lb/day)Capital Cost0.8 4 8 42 83 417 834 CategoryStorage <strong>and</strong> Feed Tanks $60 $60 $90 $970 $2,040 $3,560 $6,940 pHeating <strong>and</strong> Insulation $0 $0 $0 $200 $410 $950 $1,620 pMixer $0 $0 $0 $180 $240 $620 $640 pStairway $0 $0 $0 $0 $0 $300 $600 pMan. Transfer Pump $100 $100 $100 $0 $0 $0 $0 pPipes <strong>and</strong> Valves $310 $310 $310 $470 $470 $530 $790 pMetering Pump $390 $390 $390 $390 $410 $1,090 $1,100 pContainment Wall $120 $120 $150 $270 $400 $600 $880 pLabor $280 $280 $280 $420 $480 $650 $860 cElectrical $80 $80 $80 $100 $100 $120 $120 pSubtotal $1,340 $1,340 $1,400 $3,000 $4,550 $8,420 $13,550Contingencies $200 $200 $210 $450 $680 $1,260 $2,030 cTotal $1,540 $1,540 $1,610 $3,450 $5,230 $9,680 $15,580Table B13.2 - <strong>Water</strong> Model Base Construction Cost Analysis <strong>for</strong> Sodium Hydroxide FeedCost Component0.8 4 8Maximum Feed Rate (lb/day)Average42 83 417 834 PercentStorage <strong>and</strong> Feed Tanks 3.90% 3.90% 5.59% 28.12% 39.01% 36.78% 44.54% 23.12%Heating <strong>and</strong> Insulation 0.00% 0.00% 0.00% 5.80% 7.84% 9.81% 10.40% 4.84%Mixer 0.00% 0.00% 0.00% 5.22% 4.59% 6.40% 4.11% 2.90%Stairway 0.00% 0.00% 0.00% 0.00% 0.00% 3.10% 3.85% 0.99%Man. Transfer Pump 6.49% 6.49% 6.21% 0.00% 0.00% 0.00% 0.00% 2.74%Pipes <strong>and</strong> Valves 20.13% 20.13% 19.25% 13.62% 8.99% 5.48% 5.07% 13.24%Metering Pump 25.32% 25.32% 24.22% 11.30% 7.84% 11.26% 7.06% 16.05%Containment Wall 7.79% 7.79% 9.32% 7.83% 7.65% 6.20% 5.65% 7.46%Labor 18.18% 18.18% 17.39% 12.17% 9.18% 6.71% 5.52% 12.48%Electrical 5.19% 5.19% 4.97% 2.90% 1.91% 1.24% 0.77% 3.17%Contingencies 12.99% 12.99% 13.04% 13.04% 13.00% 13.02% 13.03% 13.02%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 B-13February 1999<strong>Water</strong> Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!