Table C21.1 - Base <strong>Costs</strong> Obtained from the WATERCO$T Model <strong>for</strong> Recarbonation BasinsCost ComponentSingle Basin Volume (ft3)Capital Cost770 1,375 2,750 5,630 8,800 17,600 35,200 CategoryExcavation & Sitework $520 $620 $980 $1,390 $1,790 $3,050 $5,570 cConcrete $1,380 $1,860 $2,820 $4,050 $5,190 $8,570 $15,320 pSteel $2,250 $3,010 $4,670 $6,560 $8,320 $13,960 $25,240 pLabor $2,830 $3,800 $5,730 $8,090 $10,240 $16,740 $29,730 cPipes <strong>and</strong> Valves $90 $130 $250 $480 $680 $1,360 $3,360 pContingencies $1,060 $1,410 $2,170 $3,090 $3,930 $6,550 $11,880 cTotal $8,130 $10,830 $16,620 $23,660 $30,150 $50,230 $91,100Table C21.2 - WATERCO$T Model Base Construction Cost Analysis <strong>for</strong> Recarbonation BasinsCost ComponentSingle Basin Volume (ft3)Average770 1,375 2,750 5,630 8,800 17,600 35,200 PercentExcavation & Sitework 6.40% 5.72% 5.90% 5.87% 5.94% 6.07% 6.11% 6.00%Concrete 16.97% 17.17% 16.97% 17.12% 17.21% 17.06% 16.82% 17.05%Steel 27.68% 27.79% 28.10% 27.73% 27.60% 27.79% 27.71% 27.77%Labor 34.81% 35.09% 34.48% 34.19% 33.96% 33.33% 32.63% 34.07%Pipes <strong>and</strong> Valves 1.11% 1.20% 1.50% 2.03% 2.26% 2.71% 3.69% 2.07%Contingencies 13.04% 13.02% 13.06% 13.06% 13.03% 13.04% 13.04% 13.04%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 C-21February 1999W/W Cost Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!