Table C27.1 - Base <strong>Costs</strong> Obtained from the WATERCO$T Model <strong>for</strong> Wash <strong>Water</strong> Surge BasinsCost ComponentCapacity (gal)Capital Cost10,000 50,000 100,000 500,000 CategoryExcavation & Sitework $200 $520 $1,250 $4,400 cConcrete $11,560 $39,310 $71,480 $143,680 pSteel $7,990 $25,170 $44,680 $70,770 pLabor $18,270 $58,500 $107,590 $182,150 cPipes <strong>and</strong> Valves $5,500 $7,500 $11,000 $16,000 pElectrical $1,300 $1,300 $6,000 $6,000 pContingencies $6,720 $19,850 $36,300 $63,450 cTotal $51,540 $152,150 $278,300 $486,450Table C27.2 - WATERCO$T Model Base Construction Cost Analysis <strong>for</strong> Wash <strong>Water</strong> Surge BasinsCost ComponentCapacity (gal)Average10,000 50,000 100,000 500,000 PercentExcavation & Sitework 0.39% 0.34% 0.45% 0.90% 0.52%Concrete 22.43% 25.84% 25.68% 29.54% 25.87%Steel 15.50% 16.54% 16.05% 14.55% 15.66%Labor 35.45% 38.45% 38.66% 37.44% 37.50%Pipes <strong>and</strong> Valves 10.67% 4.93% 3.95% 3.29% 5.71%Electrical 2.52% 0.85% 2.16% 1.23% 1.69%Contingencies 13.04% 13.05% 13.04% 13.04% 13.04%Total 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 C-27February 1999W/W Cost Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!