11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table B7.1 - Base <strong>Costs</strong> Obtained from the <strong>Water</strong> Model <strong>for</strong> Ferric Chloride FeedCost ComponentMaximum Feed Rate (lb/day)Capital Cost1 10 25 50 100 250 750 CategoryStorage Tank $0 $0 $0 $0 $360 $780 $2,040 pWooden Stairway $0 $0 $0 $0 $0 $300 $300 pMetering Pump $390 $390 $390 $390 $390 $1,090 $1,100 pPipes <strong>and</strong> Valves $180 $180 $180 $180 $220 $280 $280 pLabor $120 $120 $130 $130 $210 $360 $410 cElectrical $80 $80 $80 $80 $100 $120 $120 pSubtotal $770 $770 $780 $780 $1,280 $2,930 $4,250Contingencies $120 $120 $120 $120 $190 $440 $640 cTotal $890 $890 $900 $900 $1,470 $3,370 $4,890Table B7.2 - <strong>Water</strong> Model Base Construction Cost Analysis <strong>for</strong> Ferric Chloride FeedCost Component1 10 25Maximum Feed Rate (lb/day)Average50 100 250 750 PercentStorage Tank 0.00% 0.00% 0.00% 0.00% 24.49% 23.15% 41.72% 12.76%Wooden Stairway 0.00% 0.00% 0.00% 0.00% 0.00% 8.90% 6.13% 2.15%Metering Pump 43.82% 43.82% 43.33% 43.33% 26.53% 32.34% 22.49% 36.53%Pipes <strong>and</strong> Valves 20.22% 20.22% 20.00% 20.00% 14.97% 8.31% 5.73% 15.64%Labor 13.48% 13.48% 14.44% 14.44% 14.29% 10.68% 8.38% 12.74%Electrical 8.99% 8.99% 8.89% 8.89% 6.80% 3.56% 2.45% 6.94%Contingencies 13.48% 13.48% 13.33% 13.33% 12.93% 13.06% 13.09% 13.24%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 B-7February 1999<strong>Water</strong> Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!