11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table B3.1 - Base <strong>Costs</strong> Obtained from the <strong>Water</strong> Model <strong>for</strong> Basic Chemical FeedCost ComponentMaximum Feed Rate (lb/day)Capital Cost0.1-10 25 50 100 250 500 1000 CategoryDissolving Tank $290 $430 $640 $910 $1,830 $2,200 $4,400 pMixer $180 $200 $200 $240 $410 $620 $620 pMetering Pump $430 $700 $750 $1,230 $1,600 $1,670 $1,820 pPipes <strong>and</strong> Valves $180 $180 $220 $220 $280 $280 $420 pLabor $180 $180 $240 $260 $300 $330 $400 cElectrical $80 $100 $150 $200 $250 $300 $400 pSubtotal $1,340 $1,790 $2,200 $3,060 $4,670 $5,400 $8,060Contingencies $200 $270 $330 $460 $700 $810 $1,210 cTotal $1,540 $2,060 $2,530 $3,520 $5,370 $6,210 $9,270Table B3.2 - <strong>Water</strong> Model Base Construction Cost Analysis <strong>for</strong> Basic Chemical FeedCost Component0.1-10 25 50Maximum Feed Rate (lb/day)Average100 250 500 1000 PercentDissolving Tank 18.83% 20.87% 25.30% 25.85% 34.08% 35.43% 47.46% 29.69%Mixer 11.69% 9.71% 7.91% 6.82% 7.64% 9.98% 6.69% 8.63%Metering Pump 27.92% 33.98% 29.64% 34.94% 29.80% 26.89% 19.63% 28.97%Pipes <strong>and</strong> Valves 11.69% 8.74% 8.70% 6.25% 5.21% 4.51% 4.53% 7.09%Labor 11.69% 8.74% 9.49% 7.39% 5.59% 5.31% 4.31% 7.50%Electrical 5.19% 4.85% 5.93% 5.68% 4.66% 4.83% 4.31% 5.07%Contingencies 12.99% 13.11% 13.04% 13.07% 13.04% 13.04% 13.05% 13.05%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 B-3February 1999<strong>Water</strong> Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!