11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table C3.1 - Base <strong>Costs</strong> Obtained from the WATERCO$T Model <strong>for</strong> Backwash <strong>Water</strong> PumpingCost Component1,260(1.8)3,150(4.5)Pumping Capacity (mgd(gpm))6,300(9.1)18,000(25.9)22,950(33)Manufactured Equipment $11,400 $14,600 $38,380 $76,780 $95,970 pLabor $3,050 $4,410 $4,880 $9,290 $12,440 cPipes <strong>and</strong> Valves $9,780 $17,690 $17,690 $33,390 $44,780 pElectrical $13,350 $16,040 $16,740 $28,070 $33,250 pContingencies $5,640 $7,910 $11,650 $22,130 $27,970 cTotal $43,220 $60,650 $89,340 $169,660 $214,410Table C3.2 - WATERCO$T Model Base Construction Cost Analysis <strong>for</strong> Backwash <strong>Water</strong> PumpingCost Component1,260(1.8)3,150(4.5)Pumping Capacity (mgd(gpm))6,300(9.1)Manufactured Equipment 26.38% 24.07% 42.96% 45.26% 44.76% 36.68%Labor 7.06% 7.27% 5.46% 5.48% 5.80% 6.21%Pipes <strong>and</strong> Valves 22.63% 29.17% 19.80% 19.68% 20.89% 22.43%Electrical 30.89% 26.45% 18.74% 16.54% 15.51% 21.63%Contingencies 13.05% 13.04% 13.04% 13.04% 13.05% 13.04%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%18,000(25.9)22,950(33)Capital CostCategoryAveragePercentInternational Consultants, Inc.Contract 68-C6-0039 C-3February 1999W/W Cost Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!