11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table C13.1 - Base <strong>Costs</strong> Obtained from the WATERCO$T Model <strong>for</strong> Hydraulic Surface WashCost ComponentTotal Filter Area (ft2)Capital Cost140 700 1,400 7,000 14,000 28,000 CategoryManufactured Equipment $9,170 $12,050 $35,090 $82,010 $172,440 $401,200 pLabor $1,300 $2,770 $5,170 $14,710 $29,430 $66,600 cPipes <strong>and</strong> Valves $2,570 $5,100 $7,020 $13,390 $32,290 $59,870 pElectrical $12,670 $17,920 $20,440 $37,900 $61,120 $92,360 pContingencies $3,860 $5,680 $10,160 $22,200 $44,290 $93,000 cTotal $29,570 $43,520 $77,880 $170,210 $339,570 $713,030Table C13.2 - WATERCO$T Model Base Construction Cost Analysis <strong>for</strong> Hydraulic Surface WashCost ComponentTotal Filter Area (ft2)Average140 700 1,400 7,000 14,000 28,000 PercentManufactured Equipment 31.01% 27.69% 45.06% 48.18% 50.78% 56.27% 43.16%Labor 4.40% 6.36% 6.64% 8.64% 8.67% 9.34% 7.34%Pipes <strong>and</strong> Valves 8.69% 11.72% 9.01% 7.87% 9.51% 8.40% 9.20%Electrical 42.85% 41.18% 26.25% 22.27% 18.00% 12.95% 27.25%Contingencies 13.05% 13.05% 13.05% 13.04% 13.04% 13.04% 13.05%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 C-13February 1999W/W Cost Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!