11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table B9.1 - Base <strong>Costs</strong> Obtained from the <strong>Water</strong> Model <strong>for</strong> Permanganate FeedCost ComponentMaximum Feed Rate (lb/day)Capital Cost0.5-5 12.5 25 50 125 250 CategoryDissolving Tank $290 $430 $640 $910 $1,830 $2,200 pMixer $180 $200 $200 $240 $410 $620 pMetering Pump $430 $700 $750 $1,230 $1,600 $1,670 pPipes <strong>and</strong> Valves $180 $180 $220 $220 $280 $280 pLabor $180 $180 $240 $260 $300 $330 cElectrical $80 $100 $150 $200 $250 $300 pSubtotal $1,340 $1,790 $2,200 $3,060 $4,670 $5,400Contingencies $200 $270 $330 $460 $700 $810 cTotal $1,540 $2,060 $2,530 $3,520 $5,370 $6,210Table B9.2 - <strong>Water</strong> Model Base Construction Cost Analysis <strong>for</strong> Permanganate FeedCost Component0.5-5 12.5Maximum Feed Rate (lb/day)Average25 50 125 250 PercentExcavation & Sitework 18.83% 20.87% 25.30% 25.85% 34.08% 35.43% 26.73%Manufactured Equipment 11.69% 9.71% 7.91% 6.82% 7.64% 9.98% 8.96%Concrete 27.92% 33.98% 29.64% 34.94% 29.80% 26.89% 30.53%Labor 11.69% 8.74% 8.70% 6.25% 5.21% 4.51% 7.52%Pipes <strong>and</strong> Valves 11.69% 8.74% 9.49% 7.39% 5.59% 5.31% 8.03%Electrical 5.19% 4.85% 5.93% 5.68% 4.66% 4.83% 5.19%Contingencies 12.99% 13.11% 13.04% 13.07% 13.04% 13.04% 13.05%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 B-9February 1999<strong>Water</strong> Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!