11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table C26.1 - Base <strong>Costs</strong> Obtained from the WATERCO$T Model <strong>for</strong> Tube Settling ModulesCost ComponentTube Module Area (ft2)280 2,800 14,000 28,000 56,000Manufactured Equipment $4,200 $31,000 $147,000 $282,000 $504,000 pSteel $2,000 $19,500 $95,000 $155,000 $300,000 pLabor $2,500 $11,200 $49,000 $95,000 $224,000 cContingencies $1,300 $9,300 $43,700 $79,800 $154,200 cTotal $10,000 $71,000 $334,700 $611,800 $1,182,200Table C26.2 - WATERCO$T Model Base Construction Cost Analysis <strong>for</strong> Tube Settling ModulesCapital CostCategoryCost Component280 2,800Tube Module Area (ft2)Average14,000 28,000 56,000 PercentManufactured Equipment 42.00% 43.66% 43.92% 46.09% 42.63% 43.66%Steel 20.00% 27.46% 28.38% 25.34% 25.38% 25.31%Labor 25.00% 15.77% 14.64% 15.53% 18.95% 17.98%Contingencies 13.00% 13.10% 13.06% 13.04% 13.04% 13.05%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 C-26February 1999W/W Cost Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!