11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table B5.1 - Base <strong>Costs</strong> Obtained from the <strong>Water</strong> Model <strong>for</strong> Underground Clearwell StorageCost ComponentDesign Capacity (gpd)Capital Cost5,000 10,000 50,000 100,000 500,000 CategoryExcavation & Sitework $3,300 $5,700 $16,500 $25,300 $75,400 cConcrete $9,800 $16,500 $37,000 $64,000 $216,400 pSteel $300 $400 $500 $500 $600 pElectrical $2,600 $2,600 $2,600 $2,600 $2,600 pSubtotal $16,000 $25,200 $56,600 $92,400 $295,000Contingencies $2,400 $3,800 $8,500 $13,900 $44,300 cTotal $18,400 $29,000 $65,100 $106,300 $339,300Table B5.2 - <strong>Water</strong> Model Base Construction Cost Analysis <strong>for</strong> Underground Clearwell StorageCost Component5,000 10,000Design Capacity (gpd)Average50,000 100,000 500,000 PercentExcavation & Sitework 17.93% 19.66% 25.35% 23.80% 22.22% 21.79%Concrete 53.26% 56.90% 56.84% 60.21% 63.78% 58.20%Steel 1.63% 1.38% 0.77% 0.47% 0.18% 0.88%Electrical 14.13% 8.97% 3.99% 2.45% 0.77% 6.06%Contingencies 13.04% 13.10% 13.06% 13.08% 13.06% 13.07%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 B-5February 1999<strong>Water</strong> Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!