11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table C12.1 - Base <strong>Costs</strong> Obtained from the WATERCO$T Model <strong>for</strong> Horizontal Paddle, G=80Cost ComponentTotal Basin Volume (ft3)Capital Cost1,800 10,000 25,000 100,000 500,000 CategoryExcavation & Sitework $470 $2,550 $4,290 $9,970 $40,080 cManufactured Equipment $12,140 $34,210 $44,360 $115,770 $427,670 pConcrete $1,400 $7,610 $12,740 $29,770 $120,280 pSteel $2,360 $12,550 $20,440 $46,500 $175,290 pLabor $7,080 $22,190 $32,370 $90,170 $289,520 pElectrical $6,980 $28,320 $28,320 $28,320 $141,610 pContingencies $4,560 $16,110 $21,380 $48,080 $179,170 cTotal $34,990 $123,540 $163,900 $368,580 $1,373,620Table C12.2 - WATERCO$T Model Base Construction Cost Analysis <strong>for</strong> Horizontal Paddle, G=80Cost ComponentTotal Basin Volume (ft3)Average1,800 10,000 25,000 100,000 500,000 PercentExcavation & Sitework 1.34% 2.06% 2.62% 2.70% 2.92% 2.33%Manufactured Equipment 34.70% 27.69% 27.07% 31.41% 31.13% 30.40%Concrete 4.00% 6.16% 7.77% 8.08% 8.76% 6.95%Steel 6.74% 10.16% 12.47% 12.62% 12.76% 10.95%Labor 20.23% 17.96% 19.75% 24.46% 21.08% 20.70%Electrical 19.95% 22.92% 17.28% 7.68% 10.31% 15.63%Contingencies 13.03% 13.04% 13.04% 13.04% 13.04% 13.04%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 C-12February 1999W/W Cost Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!