11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table C5.1 - Base <strong>Costs</strong> Obtained from the WATERCO$T Model <strong>for</strong> ChlorinationCost ComponentChlorine Feed Capacity (lb/day)Capital Cost10 500 1,000 2,000 5,000 10,000 CategoryManufactured Equipment $6,760 $21,630 $41,630 $65,950 $76,780 $114,360 pLabor $820 $2,610 $5,030 $7,960 $9,270 $13,810 cPipes <strong>and</strong> Valves $540 $1,710 $3,300 $5,230 $6,080 $9,060 pElectrical $770 $2,450 $4,710 $7,460 $8,690 $12,940 pHousing $2,430 $18,360 $27,760 $46,550 $100,440 $186,490 pContingencies $1,700 $7,010 $12,360 $19,970 $30,190 $50,500 cTotal $13,020 $53,770 $94,790 $153,120 $231,450 $387,160Table C5.2 - WATERCO$T Model Base Construction Cost Analysis <strong>for</strong> ChlorinationCost ComponentChlorine Feed Capacity (lb/day)Average10 500 1,000 2,000 5,000 10,000 PercentManufactured Equipment 51.92% 40.23% 43.92% 43.07% 33.17% 29.54% 40.31%Labor 6.30% 4.85% 5.31% 5.20% 4.01% 3.57% 4.87%Pipes <strong>and</strong> Valves 4.15% 3.18% 3.48% 3.42% 2.63% 2.34% 3.20%Electrical 5.91% 4.56% 4.97% 4.87% 3.75% 3.34% 4.57%Housing 18.66% 34.15% 29.29% 30.40% 43.40% 48.17% 34.01%Contingencies 13.06% 13.04% 13.04% 13.04% 13.04% 13.04% 13.04%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 C-5February 1999W/W Cost Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!