11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table C7.1 - Base <strong>Costs</strong> Obtained from the WATERCO$T Model <strong>for</strong> Clearwell StorageCost ComponentCapacity (gal)Capital Cost10,000 50,000 100,000 500,000 1,000,000 7,500,000 CategoryExcavation & Sitework $140 $190 $410 $2,030 $19,440 $30,020 cConcrete $8,250 $14,430 $23,280 $66,330 $105,520 $622,500 pSteel $5,700 $9,240 $14,550 $32,670 $113,050 $350,700 pLabor $13,050 $21,480 $35,040 $84,090 $109,290 $394,160 pElectrical $1,270 $1,270 $6,010 $6,010 $9,800 $9,800 pContingencies $4,260 $6,990 $11,890 $28,670 $53,570 $211,080 cTotal $32,670 $53,600 $91,180 $219,800 $410,670 $1,618,260Table C7.2 - WATERCO$T Model Base Construction Cost Analysis <strong>for</strong> Clearwell StorageCost ComponentCapacity (gal)Average10,000 50,000 100,000 500,000 1,000,000 7,500,000 PercentExcavation & Sitework 0.43% 0.35% 0.45% 0.92% 4.73% 1.86% 1.46%Concrete 25.25% 26.92% 25.53% 30.18% 25.69% 38.47% 28.67%Steel 17.45% 17.24% 15.96% 14.86% 27.53% 21.67% 19.12%Labor 39.94% 40.07% 38.43% 38.26% 26.61% 24.36% 34.61%Electrical 3.89% 2.37% 6.59% 2.73% 2.39% 0.61% 3.10%Contingencies 13.04% 13.04% 13.04% 13.04% 13.04% 13.04% 13.04%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 C-7February 1999W/W Cost Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!