11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table B11.1 - Base <strong>Costs</strong> Obtained from the <strong>Water</strong> Model <strong>for</strong> Raw <strong>Water</strong> PumpingCost ComponentDesign Capacity (gpd)Capital Cost28,800 144,000 504,000 720,000 1,008,000 CategoryExcavation & Sitework $11,700 $11,700 $12,300 $12,300 $12,800 cManufactured Equipment $6,600 $7,800 $11,800 $12,600 $16,500 pConcrete $500 $500 $1,100 $1,100 $1,500 pLabor $3,700 $3,800 $5,800 $6,200 $8,500 cPipes <strong>and</strong> Valves $1,500 $1,800 $2,700 $3,600 $4,500 pElectrical $800 $800 $1,400 $1,600 $2,100 pSubtotal $24,800 $26,400 $35,100 $37,400 $45,900Contingencies $3,700 $4,000 $5,300 $5,600 $6,900 cTotal $28,500 $30,400 $40,400 $43,000 $52,800Table B11.2 - <strong>Water</strong> Model Base Construction Cost Analysis <strong>for</strong> Raw <strong>Water</strong> PumpingCost Component28,800 144,000Design Capacity (gpd)Average504,000 720,000 1,008,000 PercentExcavation & Sitework 41.05% 38.49% 30.45% 28.60% 24.24% 32.57%Manufactured Equipment 23.16% 25.66% 29.21% 29.30% 31.25% 27.72%Concrete 1.75% 1.64% 2.72% 2.56% 2.84% 2.30%Labor 12.98% 12.50% 14.36% 14.42% 16.10% 14.07%Pipes <strong>and</strong> Valves 5.26% 5.92% 6.68% 8.37% 8.52% 6.95%Electrical 2.81% 2.63% 3.47% 3.72% 3.98% 3.32%Contingencies 12.98% 13.16% 13.12% 13.02% 13.07% 13.07%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 B-11February 1999<strong>Water</strong> Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!