11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table C18.1 - Base <strong>Costs</strong> Obtained from the WATERCO$T Model <strong>for</strong> Polymer Feed SystemsCost ComponentFeed Capacity (lb/hr)Capital Cost1 10 100 200 CategoryManufactured Equipment $11,670 $11,670 $14,730 $18,970 pLabor $700 $700 $700 $760 cPipes <strong>and</strong> Valves $280 $280 $280 $300 pElectrical $1,290 $1,290 $1,290 $1,290 pHousing $3,600 $3,600 $4,050 $4,500 pContingencies $2,630 $2,630 $3,160 $3,870 cTotal $20,170 $20,170 $24,210 $29,690Table C18.2 - WATERCO$T Model Base Construction Cost Analysis <strong>for</strong> Polymer Feed SystemsCost ComponentFeed Capacity (lb/hr)Average1 10 100 200 PercentManufactured Equipment 57.86% 57.86% 60.84% 63.89% 60.11%Labor 3.47% 3.47% 2.89% 2.56% 3.10%Pipes <strong>and</strong> Valves 1.39% 1.39% 1.16% 1.01% 1.24%Electrical 6.40% 6.40% 5.33% 4.34% 5.62%Housing 17.85% 17.85% 16.73% 15.16% 16.90%Contingencies 13.04% 13.04% 13.05% 13.03% 13.04%Total 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 C-18February 1999W/W Cost Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!