11.07.2015 Views

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

Technologies and Costs for Removal of Arsenic From Drinking Water

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table B2.1 - Base <strong>Costs</strong> Obtained from the <strong>Water</strong> Model <strong>for</strong> Anion ExchangeCost ComponentResin Volume (ft3)Capital Cost4 17 54 188 280 520 CategoryExcavation & Sitework $2,100 $2,100 $4,400 $4,400 $4,400 $5,300 cManufactured Equipment $3,100 $8,600 $23,100 $64,100 $96,800 $164,800 pConcrete $300 $400 $5,500 $5,800 $6,000 $8,400 pSteel $0 $0 $7,800 $7,800 $7,800 $10,900 pLabor $400 $1,100 $12,100 $12,800 $12,900 $17,200 cPipes <strong>and</strong> Valves $800 $800 $1,000 $2,600 $2,600 $3,100 pElectrical $3,100 $3,100 $3,100 $3,100 $3,100 $3,100 pHousing $5,600 $9,600 $11,100 $16,600 $19,200 $25,000 pSubtotal $15,400 $25,700 $68,100 $117,200 $152,800 $237,800Contingencies $2,300 $3,900 $10,200 $17,600 $22,900 $35,700 cTotal $17,700 $29,600 $78,300 $134,800 $175,700 $273,500Table B2.2 - <strong>Water</strong> Model Base Construction Cost Analysis <strong>for</strong> Anion ExchangeCost Component4 17Resin Volume (ft3)Average54 188 280 520 PercentExcavation & Sitework 11.86% 7.09% 5.62% 3.26% 2.50% 1.94% 5.38%Manufactured Equipment 17.51% 29.05% 29.50% 47.55% 55.09% 60.26% 39.83%Concrete 1.69% 1.35% 7.02% 4.30% 3.41% 3.07% 3.48%Steel 0.00% 0.00% 9.96% 5.79% 4.44% 3.99% 4.03%Labor 2.26% 3.72% 15.45% 9.50% 7.34% 6.29% 7.43%Pipes <strong>and</strong> Valves 4.52% 2.70% 1.28% 1.93% 1.48% 1.13% 2.17%Electrical 17.51% 10.47% 3.96% 2.30% 1.76% 1.13% 6.19%Housing 31.64% 32.43% 14.18% 12.31% 10.93% 9.14% 18.44%Contingencies 12.99% 13.18% 13.03% 13.06% 13.03% 13.05% 13.06%Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%International Consultants, Inc.Contract 68-C6-0039 B-2February 1999<strong>Water</strong> Model Capital Cost Breakdown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!