14BUSWAYSYSTEMSBusway SystemsInstallation and Application InformationInstallationIn preparation for installation of yourbusway systems, it is important tofamiliarize yourself with the followinginstallation publications:▪ General Instructions For Handling,Installation, Operation andMaintenance of Busway Rated 600volts or less (NEMA StandardsPublication BU1)▪ Storage, Installation andMaintainance Instructions for SentronBusway (31-9918-01)These publications should be readthrough thoroughly and used asreference during installation to ensureproper installation procedures. AllBusway Order Entry ChecklistNote: Submit one checklist for each busway run.Date Submitted: ____________Purchase Order #: _______________________Project Name: _____________________________Submitted By: _____________________________Sales Engineer: _________________________________ Released _____ Hold for ReleaseRun Designation: ___________________________Busway Catalog #: __________________________Service: _____ Phase _____ Wire _____ Volts _____ AmpsConductor: _____ Cu _____ Al _____ “M” Rated _____ “L”RatedNeutral: _____ None _____ 100% _____ 200%Ground: _____ Case _____ Internal _____ IsolatedIP Rating _____ IP40 (Indoor)_____ IP55 (Splash Proof)_____ NEMA 3R (Outdoor)Shipping Instructions:_____ Ship complete _____ Ship partialSpecial Shipping Requirements:___________________________Ship not before date: ____________Drawing Requirements:_____ Approval drawings _____ # copies:_____ Record drawings _____ # copies:A) Engineering InformationCheck applicable information and be sure it is shown onaccompanying drawing.equipment should be inspected upondelivery. If the busway is not installedimmediately, it should be stored in aclean, dry location. Factory suppliedrecord drawings as well as installationtools should be accessible in preparationfor installation.UL 1479 Fire Rated InstallationsSentron Busway has been tested inaccordance with UL 1479 and offers acertified two hour fire rating for gypsumwallboard construction and a three hourfire rating for concrete slab or blockpenetrations. These ratings wereachieved using standard buswayinstalled with SpecSeal ® sealant fromSpecified Technologies Inc. TheSpecSeal ® fire stop system providessuperior11. _____ Riser Busa) _____ Load side of bus plug (top or bottom)b) _____ Required distance from floor to top ofpanel/plugsc) _____ Meter Bank (center line of tap stack)d) _____ Barriers and/or floor supports12. _____ Transformer Connectionsa) _____Standard XFMR Service Heads_____ 1-three phase_____ 3-single phaseb) Special drawing required_____ Dimensions between phases_____ LV spade detail including drilling andthickness_____ Dimension of the LV spade from tank wall_____ Throat opening and hole pattern (if any)13. _____ Utility Vault Connection Utility Type: __________ Drawing Attached14. End Cable Tap Box_____ Horizontal_____ Vertical_____ Standard Lugs_____ Special Lug RequirementsNo. _____ Size _____ per phase & neutralNo. _____ Size _____ per ground15. _____ Busway Mounting position in reference to floor:Selectionperformance at the industry’s lowestinstalled cost. Sentron is the firstbusway system to achieve a fire ratingfor gypsum wallboard construction.MeasuringCritical to the success of any buswayinstallation is the layout and the accuratemeasuring of the busway. First andforemost:Select a route for your busway that willrequire the fewest fittings and themaxumum number of 10' (3.05m) sections.It is important that the busway system bedesigned to meet the requirements of theNational Electric Code for Busway. Thereare a number of techniques that may beused to ensure an accurate measurementbefore purchasing and installing thebusway. The following tools will berequired during layout and masuring:▪ 100' (30.48m) tape measure▪ Meauring Stick▪ Chalkline▪ Plumb Bob▪ Marker(A laser distance measuring device maybe used to speed the measuringprocess).1. _____ Drawing Attached (Required)2. _____ Estimate Sheets Attached (Required)3. _____ Dimensions from walls, column lines, etc.4. _____ Wall, floor, roof thickness and pitch5. _____ Floor Elevations_____ Floor to floor_____ Floor to ceiling6. _____ Wall Locations7. _____ Equipment Pads shown: Height _______8. ____ Existing busway to be extendeda) _____ Phasingb) _____ Nameplate Informatioc) _____ Match to competitor: Call the factory9. ____ Secial Switchboard Connection: Provide Details10. ____ Phase transpositions: Provide phasing on drawing.FlatwiseEdgewiseB) Specifications(Check or fill appropriate blanks)1. _____ Standard busway meets specifications2. _____ Exception to specificationsa) Short circuit withstand _____ Ampere Symmetricalb) Voltage Drop Requirement _____c) Temperature-rise requirement _____d) Current density requirement _____e) Special Paint: Provide paint chip _____f) Other: ____________________________Exception to electrical specifications: Call the factory.Other Notes: _________________________________________________________________________________________________________________________________Minimal ClearancesMinimum clearances for installing feederbusway are shown. Additional clearancemay be required for plug-in deviceslarger than 100A fusible and 250A circuitbreaker.14-46<strong>Siemens</strong> Power Distribution & Control, SPEEDFAX 2007-2008 Product Catalog

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!