8.26.6.3 PP Saddles8.26.6.3.1 The body of the tapping saddle should be made from Poly propylene.8.26.6.3.2 The rubber ring to arrest leakage, provided around the tapping location of thesaddle shall be made with Neoprene.8.26.6.3.3 The fasteners used to fix the saddle to the PE water mains shall be maid withstainless steel/carbon steel.8.26.6.3.4 The tapping saddles be suitable to tap PE water mains of diameter 63 to200mm <strong>and</strong> the pressure rating of the saddle shall be PN16.8.26.6.4 Electrofusion Saddles8.26.6.4.1 The Electrofusion saddle should confirm to PrEN 12201-3.8.26.6.4.2 It should be manufactured from virgin compounded blue/black resign or naturalresign with blue or black master batch.8.26.6.4.3 The body of the tapping saddle should be made from Poly Propylene.The tapping saddles shall be suitable to tap PE water mains of diameter 63 to200mm <strong>and</strong> the pressure rating of the saddle.8.26.7 Tests to Establish Portability of work8.26.7.1 Pipes specimen shall be subjected to tests specified below in order to establishthe suitability of these pipes for use in carrying potable water.8.26.7.1.1 Smell of the extract8.26.7.1.2 Clarity of the colour of the extract8.26.7.1.3 Acidity <strong>and</strong> alkality8.26.7.1.4 Global migration UV absorbing material Heavy metals8.26.7.1.5 Unreacted monomers (styrens) <strong>and</strong> Biological tests.8.27 Measurement8.27.1 The net length of pipes as laid or fixed shall be measured in running meterscorrect to a cm. Specials shall be excluded <strong>and</strong> measured <strong>and</strong> paid separatelyunder the relevant item.8.27.2 The portion of the pipes at the joints (inside the joints) shall not be included inthe length of pipe work.8.27.3 Excavation, refilling, masonry <strong>and</strong> concrete work wherever required shall bemeasured <strong>and</strong> paid for separately under relevant items of work.8.28 RatesThe rate shall include the cast of the material <strong>and</strong> labour involve in all theoperation describe in the item.8.29 Zero Velocity Valves8.29.1 Construction:8.29.1.1 Body: The Spring Loaded self-actuating Zero Velocity valve has an outerfabricated casing ('Main Body') in which a 'Central Rod' is held by struts. Inorder to create an annular flow the included angle of the cone at upstream ofthe disc should be 50-60° <strong>and</strong> the cone at downstream of the cone should be20-30°. The barrel at inlet <strong>and</strong> outlet of the valve should suit the pipe diameter.The barrels should have minimum length of 250 mm to 500 mm based on thesize of valve for the ease of installation.Urban Administration & Development Department Page 100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!