12.07.2015 Views

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.3.2.4 Where the coating material has a bitumen base, it shall be smooth <strong>and</strong>tenacious <strong>and</strong> hard enoughpenknife.4.3.2.5 When the pipes to be used for conveying potable water the inside coating shallnot contain any constituent soluble in such water or any ingredient which couldimpart any taste or whatsoever to the potable water after sterilization <strong>and</strong>suitable washing of the mains.4.3.2.6 Pipes with or without sockets <strong>and</strong> flanges which are imperfectly coated orwhere the coating does not set or conform to the required quality, the coatingshall be removed <strong>and</strong> the pipes/flanges recoated.4.4 Hydrostatic site test pressures <strong>and</strong> hydraulic working pressure.4.4.1 Hydrostatic site test pressures <strong>and</strong> hydraulic working pressure of the newly laidpipe line is specified as under inTable No.4.6Refer Amendment No.1, (Annex E -Table 1) : IS 8329-2000DNAllowable operatingpressure(excludingsurge) AOPAllowable MaximumOperating pressure(Including surge) MOPAllowable site testPressure (STP)K7 K9 K7 K9 K7 K9MPa MPa MPa80 0.8 6.4 1.25 7.7 1.75 9.6100 0.8 6.4 1.25 7.7 1.75 9.6125 0.8 6.4 1.25 7.7 1.75 9.6150 0.8 6.4 1.25 7.7 1.75 9.6200 0.8 6.2 1.25 7.4 1.75 7.9250 0.8 5.4 1.25 6.5 1.75 7.0300 0.8 4.9 1.25 5.9 1.75 6.4350 0.8 4.5 1.25 5.4 1.75 5.9400 0.8 4.2 1.25 5.1 1.75 5.6450 0.8 4.0 1.25 4.8 1.75 5.3500 0.8 3.8 1.25 4.6 1.75 5.1600 0.8 3.6 1.25 4.3 1.75 4.8700 0.8 3.4 1.25 4.1 1.75 4.6750 0.8 3.3 1.25 3.9 1.75 4.4800 1.0 3.2 1.5 3.8 2.0 4.3900 1.0 3.1 1.5 3.7 2.0 4.21000 1.0 3.0 1.5 3.6 2.0 4.14.4.2 Other Test of Pipes :4.4.2.1 Mechanical test are carried out during the manufacture. One test shall beconducted for every batch of production.Urban Administration & Development Department Page 46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!