12.07.2015 Views

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

14.22. Automotive Suction Machine :14.22.1 Suction units create vacuum required for syphoning of mud, slurry, grit <strong>and</strong>other materials from sanitary, storm <strong>and</strong> combined sewerage systems. Thevacuum created is such as to syphon the materials from the deep manholescatch-pits, septic tanks etc. having depth ranging from 1m to 8m in normalcases with an option to suck additional 4m with the help of special accessoriesfor the purpose. The unit can be vehicle or trolley mounted.14.22.2 Silt <strong>and</strong> heavy particles settled at the bottom can be agitated <strong>and</strong> loosened bypressurised air with the help of the pump <strong>and</strong> then sucked in a tank. Once thesilt tank is full, the effluent is discharged in the nearby storm water drain ormanhole <strong>and</strong> the operation is repeated till the manhole is cleared off the silt.The silt deposited in the tank is then emptied at the predetermined dumpingspot.14.23 Emergency Maintenance14.23.1 Emergency maintenance becomes necessary for removal of obstruction insewers caused by excessive silt accumulation or damage leading to the breakdown of the system with flows much lower than the normal.14.23.2 The sewer gang for this type of work should consist of specially trained menwho are aware of the hazards <strong>and</strong> capable of coping with situations calling forprompt action. The supervision in this case should be entrusted to aresponsible person well-versed in the use of the special sewer cleaningequipments, safety equipments <strong>and</strong> in first aid.14.23.3 For locating the exact position of blockage, it is necessary to commenceobservation from the overflowing manholes down the line until the first manholewith little or no flow is reached. The section between this manhole <strong>and</strong> the oneimmediately upstream is the one which is blocked <strong>and</strong> requires to be tackled.14.23.4 In the case of simple blockages, the split bamboo rods can be effectively used.The end of the bamboo rod is tied with cloth to make a small ball of 30 to50mm thick <strong>and</strong> is inserted into the sewer line from the lower manhole wherethere is little or no sewage flowing. The bamboo rods are then inserted <strong>and</strong>pushed until the place of blockage is reached.14.23.4.1 The rod is then pulled out a little <strong>and</strong> struck against the blockage with a jerk.This is repeated a number of times till the blockage is removed. In case of apersistent blockage, flexible bamboo splits are inserted from the uppermanhole also. This can be done by an experienced person even though themanhole is filled with sewage. The operation of striking against the blockage iscarried out simultaneously from both ends continuously till it is removed.14.23.5 Sectional sewer rods with a cutting edge are also used where available. Aferret in conjunction with a fire hose is also used for removing s<strong>and</strong> blockages.Urban Administration & Development Department Page 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!