12.07.2015 Views

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

17.13.4 Fine enough to prevent the passage through its pores of particles from theformation materials.17.13.5 Course enough to give a lesser resistance so that the head loss in flow of waterthrough it should be relatively small.17.13.6 Gravels shall be as specified in IS 4097: 1988 (Reaffirmed - 1993).17.14. <strong>Tube</strong> wells drilled shall be perfectly vertical. The rates for drilling are inclusiveof the verticality test required to be conducted. All the drilling shall be as per IS:2800 (<strong>Part</strong>-I): 1979: tube well construction (First Revision) (Reaffirmed 1885)the testing of the tube well shall be as per IS: 2800 (<strong>Part</strong>-II) 1979: <strong>Tube</strong> welltesting (First Revision) (Reaffirmed 1990).17.15. The rates for drilling provided in the are inclusive of depreciation charges of allthe machinery, tools & plants required for drilling operation, transportation ofdrilling machine, erection of machine at site, removal of machine from site aftercompletion, cost of water, cost of drilling mud, fuel, labour <strong>and</strong> all otherunforeseen items for drilling work <strong>and</strong> clearance of site after completion ofwork.17.16 For location/Selection of site resistively survey shall be carried out by a wellqualified <strong>and</strong> experienced geo hydrologist. Resistively meter shall be providedby the concerned Geo hydrologist.17.17 The diameter of ordinary tube wells constructed for installation of h<strong>and</strong> pumpsshall be 125 mm up to bottom level of the casing pipe <strong>and</strong> 115 mm in the rockbelow the casing. Such tube wells shall be designated as 125/115 mm diaordinary tube wells.17.18 The ordinary tube wells constructed for installation of h<strong>and</strong> pumps in thebasaltic rock area where intertrappean formation (collapsible strata betweenthe rocks) is present. The nominal diameter of the tube well up to the level ofintertrappean formation shall be 150 mm.17.18.1 The intertrappean formation shall be encased by 125 mm dia G.I. casing pipe.Therefore, the finished nominal diameter of tube well in the intertrappeanformation the nominal diameter of tube well shall be 115 mm. Such tube wellsshall be designated as 150/125/115 mm dia ordinary tube wells.17.19 The nominal diameter of ordinary tube wells constructed for installation ofpower pumps shall be 150 mm or 200 mm for the entire depth depending uponthe type <strong>and</strong> size of pump to be installed in the tube well. Such tube wells shallbe designated as 150 mm dia ordinary tube well & 200 mm dia ordinary tubewells.17.20 The gravel packed tube wells shall be constructed in alluvial formation, suitablefor such tube wells, in which the fine <strong>and</strong> uniform s<strong>and</strong> is present in the waterUrban Administration & Development Department Page 204

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!