17.29.1 All the exterior parts of pump coming in contact with the water shall bethoroughly cleaned <strong>and</strong> dusted with bleaching powder. The h<strong>and</strong> pump afterinstallation shall be tested for its proper installation by operating it continuouslyat least for four hour <strong>and</strong> measuring the rate of discharge from h<strong>and</strong> pump.17.29.2 The rates for the item of installation of h<strong>and</strong> pump <strong>and</strong> yield test by h<strong>and</strong> pumpgiven in this unified schedule of rates shall be applicable.17.29.3 For construction of platform <strong>and</strong> drain for the h<strong>and</strong> pump, the contractor shalluse only steel plate frame shuttering designed as per the dimensionalrequirement of platform <strong>and</strong> drain. This shuttering shall be got approved fromthe Engineer-in-Charge.17.30 In case of construction of platforms in areas having black cotton soil, the topthirty centimeters of the black cotton soil shall be excavated <strong>and</strong> replaced withmorrum boulder, duly rammed <strong>and</strong> watered in layers, prior to the constructionof such platforms including drain, pedestal <strong>and</strong> washing platform. Rates forthese works have been provided for in the USOR.17.31 Rates do not cover labour charges for the installation of submersible pump setas per the yield of the tube well, cast of the submersible pump set, panel board,pipes, obtaining electrical connection for the purpose etc.17.32 Measurement:Depth of the bore shall be measured in meter correct to a cm. Length of thecasing pipe, slotted pipe shall be measured in running meter correct to a cm.Gravels shall be measured cubic meter deducting the voids.17.33 Rates:The rate shall include the cast of the material, labour involved, cost of fuel,depreciation on machinery <strong>and</strong> tools <strong>and</strong> plan in all the operation describe inthe item.Urban Administration & Development Department Page 207

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!