12.07.2015 Views

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHAPTER NO. 17DRILLING OF TUBE WELLS17.1 Applicable codesThe construction & testing of tube wells, mild steel tubes, unplastized PVCscreen <strong>and</strong> casing pipes, gravels <strong>and</strong> h<strong>and</strong> pump etc shall comply with allcurrently applicable statutes, regulations, st<strong>and</strong>ards <strong>and</strong> codes. In particular thefollowing st<strong>and</strong>ards, unless otherwise specified herein, shall be referred. In allcases, the latest revision of the st<strong>and</strong>ards/codes shall be referred to. Other IS:Codes not specifically mentioned here but pertaining to the use of construction& testing of tube wells, mild steel tubes, unplastized PVC screen <strong>and</strong> casingpipes, gravels <strong>and</strong> h<strong>and</strong> pump etc shall be part of this specification.IS: 2800 (part-1):1991(Reaffirmed 2001)-IS: 2800 (part-II): 1979(Reaffirmed 1999)-IS: 1239 (<strong>Part</strong>-I & II)- 1990IS : 4985 : 2000IS:11189-1985(Reaffirmed 1999):IS:4097-1988(Reaffirmed 1999):IS: 15500 (<strong>Part</strong>-I to VIII)IS: 12818 : 1992Table 18.1Code of practice for construction & testing oftube wells/Bore wellsCode of practice for construction & testing oftube wells/Bore wells.Mild steel tubes, tubular & other wrought steelfittings-specificationSpecification of un-plasticized PVC Pipes forpotable water supply.Method of tube well developmentSpecification for gravel for use as pack in tubewells.Deep well h<strong>and</strong> pumps, components <strong>and</strong>special tools- specification.Unplasticized PVC screen <strong>and</strong> casing pipes forbore/tube well-specification.17.2 The rates of drilling work have been worked out on the basis of the workingrates of the drilling rigs, labour charges, fuel charges <strong>and</strong> rates of othermiscellaneous items.17.3 The drilling shall be done in accordance with the specification.(Refer annexureA also) <strong>Specifications</strong> for the drilling of tube wells in general are as mentionedunder:-17.4 A bore hole vertical within the prescribed non-vertical limits drilled up todesigned depth in alluviums or rocky areas.17.5 Installation of requisite well assembly i.e. housing pipe, blind pipe, slotted pipeof strainers, bail plug <strong>and</strong> other accessories.17.6 Placing of suitable gravel pack (in case of gravel, packed tube wells). Placingof suitable s<strong>and</strong> pack (in case of s<strong>and</strong> packed tube wells).Urban Administration & Development Department Page 201

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!