16.9.12 The cover shall be capable of easy opening <strong>and</strong> closing <strong>and</strong> it shall be fitted inthe frame in workmanship like manner.16.9.13 Provision has also been made for the labour component of the fixing of C.I.manholes cover with frames. This items does not including cost of C.I.manholes covers with frames <strong>and</strong> other material required.16.10 Any pavement, fence, or other property <strong>and</strong> surface structures are damaged,or disturbed during the course of the work, such property <strong>and</strong> surfacestructures shall be made good after completion of work. It shall be restored to acondition equal to that before the work began.16.11 No Permanent pavement shall be restored unless <strong>and</strong> until, in the opinion ofthe Engineer in charge the condition of the backfill is such as to properlysupport the pavement.16.12 The width of pavement removal along the normal trench for the installation ofthe pipe shall not exceed the width of the trench specified by more then 15 CMon each side of the trench.16.13 Wherever in the opinion of the Engineer in charge existing conditions make itnecessary or advisable to remove additional pavement, it shall be removed asdirected by the Engineer in charge.16.14 All construction material, <strong>and</strong> all tools <strong>and</strong> temporary structures shall beremoved form the site as directed by the Engineer in charge.16.15 All dirt, rubbish <strong>and</strong> excess earth form the excavation shall be taken off to aspecified dumping site as directed by Engineer in Charge.16.16 The construction site shall be kept clean to the satisfaction of the Engineer-incharge.16.17 Measurement16.17.1 All earth work like excavation of trench for laying of pipe line shall be measuredin cum.16.17.2 All filling works shall be measured in cum.16.17.3 Cutting of pipe shall be measured per cut basis.16.17.4 Dismantling of old pipe shall be measured in meter correct to the centimeter.16.17.5 Fabrication of M.S. pipes & special shall be weight in kilogram.16.17.6 Providing <strong>and</strong> fixing C.I. Man holes covers & precast reinforced cementconcrete manholes covers shall be enumerated.16.18. RatesThe rate shall include the cast of the material <strong>and</strong> labour involved in all theoperation described in the item. The rates include all tools <strong>and</strong> plants, chain,pulley blocks, other appliances etc. required for execution of the works.Urban Administration & Development Department Page 200

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!