12.07.2015 Views

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7.20.2 All pipes <strong>and</strong> fittings shall be classified according to their diameters, method ofjointing <strong>and</strong> fixing substance, quality <strong>and</strong> finish. In case of fittings of an equalbore the pipe shall be described as including all cuttings <strong>and</strong> waste. In case offittings of unequal bore, the largest bore shall be measured.7.20.3 G.I. union shall be measured <strong>and</strong> paid for separately.7.21 Rates7.21.1 The rate shall include the cast of the material <strong>and</strong> labour involve in all theoperation described in the item. The rate shall not include excavation intrenches, painting of pipes <strong>and</strong> s<strong>and</strong> filling all around the pipes unlessotherwise specified.Urban Administration & Development Department Page 88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!