12.07.2015 Views

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Name Definition Visual Acceptance LevelsLack of filloutPimpleResin-pocketAn area, occurring usually at the edge ofa laminated plastic, where thereinforcement has not been wetted withresin.Small, sharp, or conical elevation of thesurface of a laminate.An apparent accumulation of excessresin in a small localized area within thelaminate.Maximum diameter, 9.5 mmMaximum diameter, 3.0 mmMaximum diameter, 6.5 mmWash Area where the reinforcement ofmoulded plastic has moved inadvertentlyduring closure of the mould resulting inresin-rich areas.Maximum diameter, 29 mmWormholeScratchElongated air entrapment which is eitherin or near the surface of a laminate <strong>and</strong>may be covered by a thin film of curedresin.Shallow mark, groove, furrow, or channelcaused by improper h<strong>and</strong>ling or storage.Maximum diameter, 6.5 mmMaximum length, 25 mm,maximum depth, 0.255 mm9.6 CLASSIFICATION9.6.1 Five pressure classes of pipes namely, PN 3, PN 6, PN 9, PN 12 <strong>and</strong> PN 15correspond to the working pressure ratings of 300, 600, 900, 1200 <strong>and</strong> 1500kPa respectively.9.6.2 Lengths : Pipes shall be supplied in nominal lengths of 6m, 9m <strong>and</strong> 12m. Amaximum of 10 percent of the pipe section may be supplied in r<strong>and</strong>om lengths.9.7 SoundnessEach length of pipe <strong>and</strong> fittings of nominal diameter up to 1400 mm shallwithst<strong>and</strong> without leakage or cracking the internal hydrostatic test pressures asspecified in Table 16.2 for the applicable class when tested. For pipes ofnominal diameter above 1400 mm, the frequency of hydrostatic leak tests shallbe as agreed between the manufacturer <strong>and</strong> the purchaser.Urban Administration & Development Department Page 105

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!