12.07.2015 Views

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

Specifications Part 1 - Water Supply, Sewerage and Tube Well Works

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RESISTIVITY SURVEY REPORTANNEXURE -3Mohalla/BastiModel No. & Make of Resistively meter used for soundingMaps (Not to scale) Showing the location of survey point (To be attached separately in A-4size sheet.?......................... ?..........................A M O N BDATA SHEET OF FIELD MEASUREMENTSS.No. AB/2 Meters MN/2 Meters Spacing factorKK = 3.14(AM/AN)/MNMeasuredresistance(OHMS)ResistivelyOHM-MUrban Administration & Development Department Page 217

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!