13.07.2015 Views

SCT Banner Human Resources / Release Guide / 7.0

SCT Banner Human Resources / Release Guide / 7.0

SCT Banner Human Resources / Release Guide / 7.0

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 16 IPEDS Reports for 2003 - FunctionalIPEDS S1-Long Process Notes3. Run the IPEDS Summary Report extract process (PEREO61) and reportprocess (PEREO62) through the Job Submission Process or the Host Processas instructed below.Through the Job Submission Process:Note: The PERE062 process will run automatically when PERE061 is runthrough job submission.Execute the PEREO61 process from the Job Submission Process ParameterEntry Form (GJAPCTL) using the parameters outlined below.ParameterYear for Which Reportis RunEmployer CodeEntry2003Valid employer code as defined on the EmployerRule Form (PTREMPR)If a printer is not selected when this process is run, output must be viewed fromthe host. The report file is named pereo62.lis and the Web file is namedpereo62.txt.Through the Host Process:Through the host, execute pereo61.shl or (pereo61.com on VMSplatforms).• Enter the following parameter values for pereo61:ParameterEntryYear 2003Employer CodeValid employer code as defined on the EmployerRule Form (PTREMPR)4. Record the Parameter Sequence Number generated by the PEREO61 processin the Control Report of the pere061.lis file.5. Run the pereo62.shl process using the Parameter Sequence Number fromthe PEREO61 process above.This will produce the S1-Long report,pereo62.lis, as well as the Web file, pereo62.txt.6. Verify your IPEDS Detail Report against the IPEDS Summary Report.January 2005 <strong>Human</strong> <strong>Resources</strong>/Position Control <strong>Release</strong> <strong>7.0</strong>Confidential <strong>Release</strong> <strong>Guide</strong> 241

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!