17.07.2015 Views

PDF file: EURASNET Annual Report 2008

PDF file: EURASNET Annual Report 2008

PDF file: EURASNET Annual Report 2008

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

15.5 DELIVERABLES LIST (MONTHS 37-54)Del.no.Joint programme of activities (18 months period, month 37 - 54)Deliverable name WP no. Leadparticipant258 Prepare <strong>Annual</strong> <strong>Report</strong> for<strong>2008</strong> period (month 38).243 an extended brochure for thegeneral public describing theNoE, the concepts,participants and projects, aswell as alternative splicing indevelopment and disease(month 34)245 a new version of the<strong>EURASNET</strong> leaflet (month34)NatureDisseminationlevel22 Lührmann R CO 3819 Barta O PU 4019 Barta O PU 40250 Develop a stable cell line for 20 Lamond O CO 40evaluating the effect ofchemical inhibitors on premRNAsplicing in vivo(month 40).235 2009 <strong>Annual</strong> Meeting, 16 Beggs O CO 40Assisi, April, 2009 To beorganized by participant G.Biamonti (month 40)261 <strong>Report</strong> on decisions made 22 Lührmann R CO 41during the <strong>Annual</strong> Meeting2009 (month 41).242 Pursue the possibility of 18 Kjems O PU 41selecting one program for a 1-2 day career developmentworkshop in whichparticipants get hands-ontraining in the chosen topic(eg writing the cv, giving atalk or an interview, makingand presenting a poster)(month 41)149 Liaise with targeted audiences 1 Brown O PU 42and prepare appropriatecontent (month 42)150 Tools and resources 1 Brown O CO 42repository updated (month42).155 Integration of an algorithmthat computes the likelihoodof sequences to be singlestranded (PU) values intoFAST DB (month 42).4 Apweiler O CO 42Deliverydate(proj.month)230

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!