MOPLS — Poster Session 26-Jun-06 16:00 - 18:00<br />

Study of Beam-beam Effects with a Nonlinear Map at SuperKEKB<br />

SuperKEKB is an upgrade plan of the present<br />

KEKB, whose designed luminosity is 4E35/ M. Tawada, K. Ohmi (KEK)<br />

cm 2 /sec. It has a high vertical beam-beam<br />

parameter of 0.18. Because the horizontal tune is very close to half integer and the dynamic beta effect is strong,<br />

the betatron amplitude at the final quadrupole magnets would be large. The higher-order multipole components at<br />

the large amplitude may degrade the beam lifetime and the luminosity performance. We have studied the nonlinear<br />

effect on beam-beam performance at SuperKEKB.<br />

The Status of the BEPCII Project<br />

For the BEPCII Team: As a natural extension<br />

of the Beijing Electron-Positron Collider C. Zhang, L. Ma (IHEP Beijing)<br />

(BEPC), the BEPCII project has started its<br />

construction since the beginning of 2004. BEPCII will operate in beam energy of 1-2.1 GeV, its design luminosity<br />

is 1*10 33 cm- 2 s- 1 at 1.89 GeV with double-ring structure. The upgrading of the collider will also provide improved<br />

synchrotron radiation performance with higher beam energy and intensity. Some key technologies, such as superconducting<br />

RF system, low impedance vacuum devices, superconducting micro-beta quadrupoles, etc. are developed.<br />

The injector linac commissioning was carried out for the first round, and its designed performance is expected in<br />

the summer of 2006. Manufacturing of most storage ring components is completed. The upgrading of the utility<br />

for BEPCII is finished. The tunnel will be ready for BEPCII installation in February 2006. The cryogenic system<br />

commissioning and then test/measurement of the superconducting devices are on the critical path of the BEPCII<br />

schedule. The commissioning of the storage rings is planned to be started with normal magnets in the interaction<br />

region in the autumn of 2006. The project is scheduled to be c<br />

Beams Injection System for e + e − Collider VEPP-2000<br />

Electron-positron collider VEPP-2000 is under<br />

commissioning at the Budker Institute of<br />

Nuclear Physics. The paper presents the injection<br />

system of the collider delivering the<br />

beam from the booster storage ring BEP with<br />

D.E. Berkaev, V.V. Druzhinin, I. Koop, A.P. Lysenko, F.V. Podgorny,<br />

V.P. Prosvetov, P.Yu. Shatunov, Y.M. Shatunov, D.B. Shwartz (BINP<br />

SB RAS)<br />

maximum energy 900 MeV. A matching of the beam injection with the storage ring optics is done with respect to a<br />

nonlinear kicker field. Features of beam diagnostic and transfer line magnets including pulse septums (100 mksec;<br />

30 kGs) and fast kickers (20 nsec; 70 kV) are described. Results of the magnetic measurements and their comparison<br />

to calculated data are given.<br />

117<br />

MOPLS035<br />

MOPLS036<br />

MOPLS037