09.12.2012 Views

Abstracts Brochure - CERN

Abstracts Brochure - CERN

Abstracts Brochure - CERN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WEYPA — Linear Colliders, Lepton Accelerators . . . 28-Jun-06 11:00 - 12:30<br />

WEYPA — Linear Colliders, Lepton Accelerators and<br />

New Acceleration Techniques<br />

Beam Delivery System in ILC<br />

The presentation will review the challenges<br />

of this key ILC sub-system in terms of beam G.A. Blair (Royal Holloway, University of London)<br />

performances, machine protection system,<br />

collimation, interaction with the detector and compare them with the achievements in SLC and FFTB. It will then<br />

present the world-wide organization to define and make the necessary R&D for the design, beam simulations and<br />

benchmarking in tests facilities, especially the ATF2 facility under construction at KEK. It will explore the major issues<br />

both from the beam dynamics and the technological point of view, as well as the plans foreseen and the schedule<br />

to address them. It will finally analyze the possible upgrade in energy together with the possible limitations and<br />

associated issues.<br />

Damping Rings towards Ultra-low Emittances<br />

The presentation will review the various designs<br />

of Damping Rings to achieve ultra-low S. Guiducci (INFN/LNF)<br />

emittance beams in Linear Colliders (ILC and<br />

CLIC) pointing out the major issues both from the beam dynamics and the technological point of vue and comparing<br />

the required performances with the one achieved in SLC or FFTB. It will then present the design, beam simulations,<br />

benchmarking and performances already achieved in test facilities, especially the ATF1 facility developed and operated<br />

at KEK. Finally, it will present future R&D plans and schedule in terms of beam performances, beam stability<br />

and technological development as well as the world-wide organization to achieve them.<br />

CLIC Feasibility Study in CTF3<br />

After a reminder of the CLIC scheme towards<br />

multi-TeV Linear Collider and of the main A. Ghigo (INFN/LNF)<br />

challenges of this novel technology, the presentation<br />

will focus on the CTF3 test facility presently under construction at <strong>CERN</strong> to address all key issues in a<br />

multi-lateral collaboration. It will present the status of the facility and of the technological developments, especially<br />

the high field accelerating structures and the RF power production, the performances already achieved as well as the<br />

plans and schedule for the future. It will finally compare the CTF3 results with those foreseen by the theory and the<br />

corresponding benchmarking of CLIC simulations.<br />

Chair: C. Pagani (INFN/LASA, Segrate (MI)) 265<br />

WEYPA01<br />

WEYPA02<br />

WEYPA03

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!