09.12.2012 Views

Abstracts Brochure - CERN

Abstracts Brochure - CERN

Abstracts Brochure - CERN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WEPLS — Poster Session 28-Jun-06 16:00 - 18:00<br />

Electrical Systems and Power Supplies at the Spallation Neutron Source<br />

There are over 600 magnet power supplies<br />

and pulsed modulator systems at the Spallation<br />

Neutron Source. An overview of these<br />

systems is given, along with detailed systems<br />

costs and a listing of installation and testing<br />

effort for use as an estimating resource for<br />

R.I. Cutler, D.E. Anderson, W.E. Barnett, P.S. Holik, K.R. Rust, T.L.<br />

Toomey, M. Wezensky (ORNL) W. Eng, R.F. Lambiase, J.-L. Mi,<br />

T.C.N. Nehring, J. Sandberg, W. Zhang (BNL) J.G. Gioia, W. Reass<br />

(LANL)<br />

future accelerator projects. Preliminary operational reliability statistics are given for each type of power supply. Also<br />

are presented are a description and costing data for other Electrical Systems (AC power, racks, technical cabling)<br />

installed in support of the remainder of accelerator systems (vacuum, beam diagnostics, rf, controls, etc).<br />

Operation Status and Statistics of the KEK Electron/Positron Linac<br />

The KEK electron/positron linac has been<br />

operated since 1982, surpassing the total operation<br />

time of more than 100,000 hours. It<br />

delivers four different beams to four different<br />

rings quite stably, even frequently switching<br />

Y. Ogawa, A. Enomoto, K. Furukawa, T. Kamitani, M. Satoh, T.<br />

Sugimura, T. Suwada, Y. Yano, K. Yokoyama, M. Yoshida (KEK) Y.<br />

Imai, T. Kudou, S. Kusano, K. Suzuki, T. Toufuku (MELCO SC)<br />

beam modes. The operation time per year has reached 7,000 hours since 1999 when the KEKB entered a normal<br />

operation mode. Operation status and statistics will be reported with the emphasis on continuing efforts in various<br />

kinds of machine improvements, which have ensured the stable operation.<br />

Operational Status of Klystron-modulator System for PAL 2.5-GeV Electron Linac<br />

The klystron-modulator(K&M) system of the<br />

Pohang Accelerator Laboratory (PAL) gener- S.S. Park, J. Choi, Y.J. Han, J.Y. Huang, S.H. Kim, S.-C. Kim (PAL)<br />

ates high power microwaves for the acceleration<br />

of 2.5 GeV electron beams. There are 12 modules of K&M system to accelerate electron beams up to 2.5 GeV<br />

nominal beam energy. One module of the K&M system consists of the 200 MW modulator and an 80 MW S-band<br />

(2856 MHZ) klystron tube. The total accumulated high-voltage run-time of the oldest unit among the 12 K&M systems<br />

has reached nearly 88,000 hours as of December 2005. The overall system availability is well over 95%. In this paper,<br />

we review the overall system performance of the high-power K&M system and the operational status of the klystrons<br />

and thyratron lifetimes, and the overall system’s availability will be analyzed for the period of 1994 to December 2005.<br />

Update and Summary of the Dependability Assessment of the LHC Beam Dumping System<br />

The LHC Beam Dumping System (LBDS)<br />

must be able to remove the high intensity R. Filippini, J.A. Uythoven (<strong>CERN</strong>)<br />

beams from the LHC accelerator on demand,<br />

at any moment during the operation. As the consequences of a major failure can be very severe, stringent safety<br />

requirements were imposed on the design. The final results of an in-depth dependability analysis on the LBDS<br />

are summarised, for one year of operation and different operational scenarios. The trade-off between safety and<br />

373<br />

WEPLS137<br />

WEPLS138<br />

WEPLS139<br />

WEPLS140

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!