09.12.2012 Views

Abstracts Brochure - CERN

Abstracts Brochure - CERN

Abstracts Brochure - CERN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

THPCH — Poster Session 29-Jun-06 16:00 - 18:00<br />

Dark Current Reduction System for the SPring-8 Linac<br />

In the SPring-8 linac, removal of dark currents<br />

generated from an injector part has T. Kobayashi (JASRI/SPring-8)<br />

been studied to enhance the bunch purity<br />

of stored beam in the SPring-8 storage ring. We already succeeded in reduction of the dark currents from a thermionic<br />

electron gun by a beam deflector of parallel plate electrodes. However, dark currents are also generated in accelerating<br />

structures due to the high electric fields. We have been studying removal of the dark currents generated from the first<br />

accelerating structure by solenoid coils covering it.<br />

Control System of the Superconducting Insertion Devices at TLS<br />

There are three superconducting insertion<br />

devices installed at Taiwan Light Source.<br />

Two is under construction. These insertions<br />

enhance hard X-ray production to satisfy the<br />

J. Chen, K.-T. Hsu, S.Y. Hsu, K.H. Hu, C.H. Kuo, D. Lee, C.-J. Wang<br />

(NSRRC)<br />

research requirement of X-ray community. The control system is implemented to support the operation of all these<br />

superconducting insertion devices. The control system coordinate the operation of the main power supply and the<br />

trimming power supply to charge/discharge the magnets and provide essential interlock protection for the coils and<br />

vacuum ducts. Friendly user interface supports routine operation. Various applications are also developed to aid the<br />

operation of these insertion devices. Design consideration and details of the implementation will be summary in this<br />

report.<br />

Present Status of Beam Collimation System of J-PARC RCS<br />

The precedence manufacture of the two<br />

beam collimator was carried out. In these K. Yamamoto (JAEA/J-PARC)<br />

two sets, we tested the heat transfer capacity<br />

of cooling fins and remote clamp handling system. The vertical collimator was able to keep temperature under 120<br />

degrees C by the design heat 400W, but in case of the horizontal collimator, it went over 200 degrees C by the design<br />

heat 700W. The design was changed towards adding an air duct. About remote clamp handling system, it checked<br />

that it could attach by the He leak below 5.*10-10Pa m3/sec as a result of the helium leak examination.<br />

Timing and Laser System for the Tsinghua Thomson Scattering X-ray Source<br />

Research on the Thomson scattering x-ray<br />

source in Tsinghua University has a strict re- Q. Du, H. Chen, W.-H. Huang, C.-X. Tang (TUB)<br />

quirement of timing performance. The rms<br />

jitter between drive laser pulse and RF phase should be less than 250fs; and the arriving time of electron bunch and<br />

terawatt laser pulse should be synchronized within 1ps. Considering the timing issue in modern x-ray facilities, this<br />

paper analyzes jitter sensitivity in photocathode RF gun and describes our timing system together with the picosecond<br />

drive laser system. A synchronization module reduces relative laser-RF timing jitter from several picosecond down<br />

to 200 fs (rms). Based on phase noise modulation theory, a corresponding phase jitter measurement system with<br />

50fs precision is designed and built using phase noise density spectrum analysis technology. Phase noise could be<br />

437<br />

THPCH170<br />

THPCH171<br />

THPCH172<br />

THPCH173

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!