09.12.2012 Views

Abstracts Brochure - CERN

Abstracts Brochure - CERN

Abstracts Brochure - CERN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MOYBPA — Circular Colliders 26-Jun-06 11:30 - 12:30<br />

MOYBPA — Circular Colliders<br />

LHC Progress and Commissioning Plans<br />

The LHC at <strong>CERN</strong> is in its final installation<br />

phase, and the first tests with beam are O.S. Brüning (<strong>CERN</strong>)<br />

planned for part of the machine for the end<br />

of 2006. The commissioning of the full machine with beam is planned for summer 2007. The talk summarizes the<br />

current status of the LHC installation and the strategy for obtaining an optimum hardware configuration. In a second<br />

part the talk outlines the main milestones for the hardware and beam commissioning and presents estimates for the<br />

expected performance levels for the commissioning phase with beam.<br />

Operation of High-luminosity Meson Factories and the Challenge to go to the Next Generation<br />

This talk will present an overview of the<br />

operational status of B- and Phi-Factories, K. Akai (KEK)<br />

and address their present luminosity performance<br />

and limitations, such as electron cloud effects. It will also discuss upgrade plans, including motivation and<br />

beam dynamics challenges, new ideas, R&D and machine experiments in view of the next generation of meson<br />

factories with ∼100 times more luminosity. In particular, it will address machine tests with strong RF focusing, crab<br />

cavity developments and first operational experience at KEKB.<br />

Chair: S.-I. Kurokawa (KEK, Ibaraki) 41<br />

MOYBPA01<br />

MOYBPA02

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!