54<br />

Chapter 3: Deploying and Troubleshooting Fiber Networks<br />

At the end of this process, the feeder and the distribution network<br />

are complete and ready for end-to-end acceptance testing<br />

consisting of overall distance, insertion loss, and ORL. Additional tests<br />

such as 1310/1550 nm OTDR testing may also be performed at this<br />

point to verify splice and connector distances,losses and reflectances.<br />

Step Task Objective Test Tool<br />

1 Check connectors on jumpers,<br />

test equipment, fiber links on<br />

distribution hub<br />

Verify connector quality Fiber inspection scope<br />

2 Install FDH and splitter<br />

and distribution network<br />

Verify continuity between feeder Fusion splicer, OTDR<br />

Check connectors on jumpers,<br />

test equipment, fiber links on<br />

terminal<br />

Verify connector quality Fiber inspection scope<br />

3 Install terminals Verify continuity between the<br />

distribution network and the<br />

drop cable and customer premises<br />

equipment<br />

Fusion splicer and OTDR<br />

Check connectors on jumpers,<br />

test equipment, fiber links on<br />

CO FDF<br />

Verify connector quality Fiber inspection scope<br />

4 Install CO FDF Verify continuity between the CO<br />

equipment and the feeder<br />

Fusion splicer and OTDR<br />

The Fiber Distribution Hub (FDH) is installed first. Then, the terminal and the Fiber Distribution Frames (FDFs) are installed. The splitter is spliced, and<br />

the CO and terminal are spliced and connected. Testing is performed with an OTDR during splicing. Connectors at the splitter location are left open.<br />

Central Office<br />

FDF<br />

OTDR<br />

Splice<br />

points<br />

FDH<br />

Splitter<br />

OTDR<br />

32 fibers/splitter<br />

1 splice/FTTP<br />

Figure 3.8 Frame installation and connection process<br />

Terminal<br />

Splice points<br />

Terminal<br />

Terminal<br />

4, 6, or 12 fibers<br />

4, 6, or 12 splices<br />

4, 6, or 12 fibers<br />

Customer<br />

Premises