Chapter 3: Deploying and Troubleshooting Fiber Networks<br />

Step Task Objective Test Tool<br />

1 Check connectors on jumpers, Verify connector quality Fiber inspection scope<br />

test equipment, fiber links<br />

2 Continuity check/Insertion Acceptance test of the Source/Power meter, ORL,<br />

loss / ORL testing of the distribution cable or OTDR<br />

distribution cable<br />

For the overall link (feeder and distribution), the international<br />

standards provide the minimum design requirements as outlined<br />

below.<br />

Network Class Min Optical Budget Max Optical Budget Min ORL value<br />

ITU-G.982 ITU-G.982 ITU-G.982 ITU-G.983/984<br />

Class A 5 dB 20 dB 32 dB, all port terminated<br />

(20 dB otherwise)<br />

Class B 10 dB 25 dB 32 dB, all port terminated<br />

(20 dB otherwise)<br />

Class C 15 dB 30 dB 32 dB, all port terminated<br />

(20 dB otherwise)<br />

Stage 6: PON Equipment Installation and Testing<br />

OLT and ONT installation are two of the key steps in building the<br />

PON infrastructure. OLTs are installed at the central office, while<br />

ONTs are installed at customer premises. ONUs are typically<br />

installed at remote central offices. As described in Stage 1, the drop<br />

cable connecting the terminal and the ONT is installed at the<br />

customer premises using either aerial or underground methods<br />

depending upon greenfield or brownfield application. The ONU is<br />

connected to the customer premises using copper cabling.<br />

The drop cable is usually pre-connectorized to expedite installation.<br />

If the connector caps remain in tact, no further testing during<br />

installation is required.With the drop cable installed, the technician<br />

can connect the drop at the terminal, then, at the FDH, connect the<br />

specific fiber for the customer. In some cases the drop cable may<br />

not be pre-connectorized.Here,connectors are added and tested in<br />

the field.<br />