26.09.2012 Views

Triple-Play Service Deployment

Triple-Play Service Deployment

Triple-Play Service Deployment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 3: Deploying and Troubleshooting Fiber Networks<br />

Acceptance testing between the CO and the splitter is performed with a bidirectional loss test set<br />

(LTS) to measure insertion loss and ORL. An OTDR may also be used for this testing.<br />

Central Office<br />

FDF<br />

OTDR<br />

LTS<br />

Figure 3.9 Acceptance testing between the CO and the splitter<br />

Terminal<br />

Terminal<br />

Customer<br />

Premises<br />

Terminal<br />

Stage 5: PON distribution cable acceptance test<br />

Prior to performing acceptance testing on the distribution cable,<br />

the technician must ensure that both the connectors and the<br />

patch cords (used for both the test and the network) are in good<br />

working condition. Tests then can be performed with either an<br />

OTDR or a source/power meter/ORL meter combination. If the<br />

technician uses and OTDR, the test should be performed from<br />

either the hub or from the customer premises, or from both if bidirectional<br />

testing is required. If the source/power meter/ORL<br />

meter combination testing option is used, two technicians are<br />

required—one at each end of the link. A VFL also may be used to<br />

check continuity. The results are compared to the design<br />

specifications of the fiber network.<br />

FDH<br />

Splitter<br />

OTDR<br />

LTS<br />

57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!