60<br />

Once customers have been established, ONTs and OLTs are installed. Next, the drop cable is installed. When the ONTs and OLTs are activated,<br />

testing with a selective power meter (SPM) is performed at the ONT and OLT locations. At the OLT location, ORL testing may be performed.<br />

Central Office<br />

FDF<br />

OLT<br />

LTS<br />

FDH<br />

Splitter<br />

Chapter 3: Deploying and Troubleshooting Fiber Networks<br />

Upon completion, the technician may opt to perform insertion<br />

loss testing again by connecting one unit to the FDH and the other<br />

unit to the fiber at the ONT. An alternative method is testing with<br />

an OTDR from the ONT location.<br />

Step Task Objective Test Tool<br />

1 Insertion loss testing of the Acceptance testing for the OTDR or source/Power meter<br />

distribution network with distribution network with<br />

drop cable drop cable<br />

Note that not all OTDRs are equipped to disable the test if customer<br />

traffic is present. When turning up a residence on a link that is<br />

already in service, the technician must never send a test signal from<br />

the premises back upstream unless the test system is equipped with<br />

an out-of-band wavelength and its performance has been verified<br />

with respect to the network.<br />

Figure 3.12 PON equipment installation testing<br />

ONT on customer premises<br />

ONT<br />

Terminal<br />

Terminal<br />

Terminal<br />

ONT<br />

Drop cables<br />