Process Control Pian for the Silo 3 Project<br />

Document No. 40430-PL-0003. Rev. 1<br />

Jacobs Project Number 35H19605<br />

September 5, 2003 _.<br />

5069' _-<br />

The Excavator is an electrically powered machine. Operator control and machine status ' 0<br />

monitoring are by radio-frequency (RF)-based remote control. An umbilical system is<br />

provided in case <strong>of</strong> failure <strong>of</strong> the RF system. Since umbilical controls are local to the<br />

Excavator, operators must enter either the Excavator Room or the <strong>silo</strong> to use this system.<br />

A remote control operator box allows the Excavator to be controlled from an observation<br />

room adjacent to the Excavator Room. This operator station is capable <strong>of</strong> initiating and<br />

performing all machine surface travel and <strong>silo</strong> material removal functions. An excavator<br />

emergency stop is also provided.<br />

The <strong>silo</strong> material is raked, carried, or pushed out <strong>of</strong> the <strong>silo</strong> to the Retrieval Bin (HBN-11-<br />

5054). The Retrieval Bin Discharge Feeder (FDR-11-5106) is speed-controlled to feed the<br />

material onto the Inclined Conveyor (DFC-11-5056). Material loading <strong>of</strong> the Inclined<br />

Conveyor is monitored through the Motor Current Transmitter (IT-DFC-11-5056). Material<br />

in the Inclined Conveyor is transported to the Transfer Cgnveyor (FDR-11-5100), which<br />

then deposits the material onto the Feed Conveyor (FDR-10-5102). This conveyor (FDR-<br />

10-5102) has two outlets, one leading to Package Loading Stand A and the other leading<br />

to Package Loading Stand B. These conveyors are started at the main operator panel by I<br />

the packaging operators. Each conveyor is interlocked with the upstream conveyor(s).<br />

CCTV cameras are provided in the <strong>silo</strong> interior, on the Excavator, and near the Retrieval I<br />

- - - - - - -<br />

- --Birr to atlow the Excavator aperator to view the <strong>silo</strong>material and-the ExzwaTo-r ape-ration: - - - - - -<br />

3.4 MRS INTERLOCKS<br />

A detailed listing <strong>of</strong> interlocks for the MRS is provided in the P&IDs and Table 3-2.<br />

3.5 MRS SETPOINTS<br />

A detailed listing <strong>of</strong> setpoints for the MRS is provided in Table 3-3.<br />

3.6 MRS DATA ARCHIVING<br />

The following MRS parameters are archived:<br />

run time for all motorized equipment,<br />

alarm events, and<br />

0 interlock events.<br />