Process Control Plan for the Silo 3 Project<br />

Document No. 40430-PL-0003, Rev. 1<br />

Jacobs Project Number 35H19605<br />

September 5, 2003<br />

This Process Control Plan (PCP) addresses the instrumentation and control logic for<br />

equipment used in the Silo 3 Project at the U.S. <strong>Department</strong> <strong>of</strong> <strong>Energy</strong> Fernald<br />

Environmental Management Project (FEMP) site. As part <strong>of</strong> the remediation <strong>of</strong> Operable<br />

Unit 4 at the FEMP, approximately 5,100 yd3 <strong>of</strong> byproduct metal oxide materials stored in<br />

Silo 3 will be removed, conditioned, packaged, and transported to an <strong>of</strong>f-site facility for I<br />

treatment and/or disposal.<br />

Two other documents are frequently referenced in the PCP. These are Process Descrr;Otion<br />

fur the Silo 3 Project (PD) (FEMP 2003a), which discusses the Silo 3 process systems and I<br />

equipment, and Access and Retrieval Strategy for the Silo 3 Project (A&RS)<br />

(FEMP 2002a), which describes the strategies used to remove material from Silo 3. The I<br />

A&RS also describes the history <strong>of</strong> generation <strong>of</strong> Silo 3 material and its quantity and<br />

characteristics (A&RS, Section 1.4).<br />

This PCP provides, on a system-by-system basis, descriptions <strong>of</strong> the following:<br />

0 Control philosophy<br />

Interlocks<br />

0 Setpoints and responses<br />

0 Data archiving<br />

1 .I<br />

SYSTEM NAMES AND NUMBERS<br />

The systems addressed in this PCP and the relevant section numbers are shown in<br />

Table 1-1: The same system names and numbers are also used in the Design Basis and<br />

Requirements Document (FEMP 2002b).<br />

1.2 NON-SYSTEM NAMES AND NUMBERS<br />

Numbering systems for equipment, lines, valves, and instruments are defined in Project<br />

Procedure FF-103-01 (Jacobs Engineering 2002). These systems are described in the<br />

following sections:<br />

1.2. I Equipment Numbering<br />

The equipment numbering system is as follows:<br />

XXXJJ-UZZ<br />

Where:<br />

0 XXX represents the Equipment Designator (see Table 1-2).<br />

0 JJ represents the System Number (see Table 1-1).<br />

0 ZZZZ represents the Equipment Sequence Number. For Silo 3, this is in the range<br />

5000-6999.<br />

All Silo 3 equipment numbers are provided in Silo 3 Project Equipment List (FEMP 2003b).<br />

1-1