2.0 DESIGN BASIS<br />

2. I Pneumatic Retrieval System<br />

Timed Estimate <strong>of</strong> Secondary Waste for the Silo 3 Project<br />

Document No. 40430-RP-0012, Rev. 0<br />

JE Project No. 35H19605<br />

July 11, 2002<br />

The following assumptions apply to the PRS for the am’ount <strong>of</strong> secondary waste<br />

generated:<br />

0<br />

0<br />

e<br />

e<br />

0<br />

e<br />

0 .<br />

e<br />

e<br />

0<br />

e<br />

0<br />

Three 35 percent supply pre-filters from a 1 x 3 array will be changed out every 3<br />

weeks for 3 months.<br />

Three 90 percent supply final filters from a 1 x 3 array will be changed out every 6<br />

weeks for 3 months.<br />

Three supply high-efficiency particulate air (HEPA) filters from a 1 x 3 array will be<br />

changed out at the end <strong>of</strong> the PRS campaign.<br />

Three 35 percent exhaust pre-filtek from a 1 x 3 array will be changed out every 3<br />

weeks for 3 months.<br />

Three 90 percent exhaust final filters from a 1 x 3 array will be changed out every 3<br />

weeks for 3 months.<br />

Three HEPA exhaust filters from a 1 x 3 array will be changed out every 3 weeks for 3<br />

months.<br />

Three ultra-low penetrating air (ULPA) filters from a 1 x 3 array will be changed out at<br />

the end <strong>of</strong> the PRS campaign.<br />

A total <strong>of</strong> 44 fabric filter bags plus a 10 percent allowance for changeout during<br />

operations will be disposed <strong>of</strong> at the end <strong>of</strong> the PRS campaign.<br />

A total <strong>of</strong> four filter cartridges plus a 10 percent allowance for changeout during<br />

operations &ill be disposed <strong>of</strong> at the end <strong>of</strong> the PRS campaign.<br />

The plastic containment sleeving associated with the Vacuum Wand Management<br />

System (VWMS) (10 polyethylene sleeve bags) will be changed out every 6 weeks for<br />

3 months and will generate two drums <strong>of</strong> waste.<br />

The VWMS will generate 15 spool pieces <strong>of</strong> aluminum tubing for each <strong>of</strong> the 5 VWMS<br />

modules. This material will be disposed <strong>of</strong> at the end <strong>of</strong> the PRS campaign.<br />

The amount <strong>of</strong> PPE clothing generated as secondary waste will depend on the number<br />

<strong>of</strong> PPE entries per day. Based on a normal operation and regular maintenance<br />

schedule, it is estimated that 20 PPE entries will be made each day. This will provide<br />

10 persons with two changes a day, or it could be distributed between fewer operators<br />

with a greater changeout frequency. The PPE will be designated as 30 percent<br />

radiologically contaminated and 70 percent non-radiologically contaminated. This<br />

generation rate is based on 3 months, 4 weeks a month, and 5 days a week. It is<br />

assumed that 50 PPE units will be contained in a 55-gallon drum.<br />