40000 PL 0014 H&S Controls<br />

The Health and Safety Controls portion <strong>of</strong> the Remedial Design Package is designed to illustrate<br />

the planned preventative or mitigative measures to address the occupational hazards identified<br />

for the Silos Project The Health and Safety Controls are presented consistent with the Silos<br />

Health and Safety Plan The Silos Health and Safety Plan takes into account the specific hazards<br />

inherent to the Silos Project site and presents procedures to be followed by Fluor Fernald its<br />

subcontractors and all other on site personnel to avoid and if necessary protect against health<br />

and/or safety hazards Exhibit 1 0 1 an excerpt from the Silos Health and Safety Plan illustrates<br />

the activities associated with the Silos Project and the hazards associated with the activities<br />

. The Health and Safety Matrix (Exhibit 1 0 2) lists the occupational hazards as identified in the<br />

Silos Project Health and Safety Plan The hazards identified in the Health and Safety Matrix are<br />

limited to those considered to be common construction and/or occupational safety hazards<br />

These hazards are addressed by the safety programs policies and procedures used to ensure that<br />

work is performed safely Some <strong>of</strong> the health and safety controls used to mitigate the<br />

occupational hazards identified are listed in terms <strong>of</strong><br />

0 Frequency and type <strong>of</strong> monitoring required<br />

0 Personnel Protective Equipment (PPE)<br />

0 Trahinp Requirements<br />

0 Medical Monitoring Requirements<br />

0 Administrative and Engineering Control Measures<br />

0 Permit@)<br />

0 Decontamination and Disposal Procedures<br />

The FEW Emergency Plan PL 3020 describes the emergency management program that<br />

responds to potential hazards at the site Potential hazards identified at FEME) include severe<br />

weather hazardous and radiological material releases bomb threats vehicldtransportation<br />

accidents earthquakes and other events The Emergency Plan identifies the responsible parties<br />

to contact in the event <strong>of</strong> an emergency and details which personnel would respond to the event<br />

Specific elements <strong>of</strong> emergency support procedures are addressed in the Silos Project Health and<br />

Safety Plan These elements include communications local emergency support units<br />

preparation for medical emergencies first aid for injuries incurred on site record keeping and<br />

emergency site evacuation procedures<br />

The health and safety controls will be developed firther as the Operations Phase <strong>of</strong> the Silos<br />

Project is hrther delineated and with the development <strong>of</strong> activity specific Work Plans<br />

Additional occupational hazards and associated mitigative measures may be identified as the<br />

project progresses<br />

Page 1 <strong>of</strong> 18<br />

5069