Total Dose<br />

--<br />

Piiiject:<br />

Calculation Number: 40430-CA-0003<br />

PageNoa o f 3<br />

The total project duration is 6 moths: 300 hours in Phase 1 and 700 hours in Phase 2.<br />

The maximum total dose rates during Phase 1 and 2 due to particulates and mRn/progeny occur at a<br />

location 994 m from Silo 3 in the north-easterly direction and are 0.16 mrem/yr.<br />

The maximum total dose rate during Phase 1 and Phase 2 due to mRn/progeny occur at a location 332 m<br />

from Silo3 in the north-easterly direction, and are 1.2 x lo4 mrem/yr and 2.0 x lo” mrem/yr, respectively.<br />

Although the maximum dose rates occur at different locations. a conservative estimate <strong>of</strong> the maximum<br />

dose rate for an <strong>of</strong>fsite receptor due to Silo 3 stack emissions may be obtained by combining the dose<br />

rates to obtain 0.17 mremlyr for Phase 1 and 0.17 mrem/yr for Phase 2. It should be noted that these<br />

annual doses are based on 1 year (8760 hours) continuous release for each phase.<br />

Since phase 1 operations are conservatively estimated to last 300 hours, the Phase 1 dose is 0.0058<br />

mrem.<br />

Since phase 2 operations are conservatively estimated to last 700 hours, the Phase 2 dose is 0.0139<br />

mrem.<br />

The total calculated potential public receptor dose estimate for both phases <strong>of</strong> Silo 3 operations is 0.02<br />

mrem.<br />

F- 5049