FAN-1 9-520644<br />

FAN-1 9-5206B<br />

FAN-1 9-5206A&B<br />

FAN-1 9-5206A&B<br />

CEM-19-5208<br />

CEM-19-5208<br />

STK-19-5209<br />

BS 5-0-6-9 ~-<br />

Table 4-3 PVS Setpoints<br />

PDI-FLT-19-<br />

5204B 1 in wg<br />

7 in wg<br />

8 in wg<br />

11-FAN-19-5206A<br />

11-FAN-19-52068<br />

PI-FAN-1 9-5206<br />

FI-FAN-19-5206 I<br />

5,000 acfm<br />

5,250 acfm<br />

5,750 acfm<br />

6,000 acfm<br />

YI-CEM-19-5208 35,000 cpm<br />

110,000 cpm<br />

AQIT-CEM-19- 500 pCi/L<br />

5208 5,000 pCi/L<br />

FI-CEM-19- By Vendor<br />

152088 (scfm)<br />

LAH-STK-19-<br />

5209 I<br />

25 amps<br />

47 amps<br />

52 amDs<br />

25 amps<br />

47 amps<br />

52 amps<br />

0.5 in wg<br />

0.75 in wg<br />

3 in wg<br />

I 5 in wg<br />

By Vendor<br />

(scfm)<br />

6 in.<br />

Process Control Plan for the Silo 3 Project<br />

Document No. 40430-PL-0003. Rev. 1<br />

Jacobs Project Number 35H 19605<br />

September 5, 2003 -~<br />

Differential Pressure:<br />

Low Operator Action<br />

High Operator Action<br />

High-High ODerator Action<br />

Current:<br />

Low<br />

High<br />

Hiah-Hinh<br />

High-High<br />

Air Flow:<br />

Low-Low<br />

Low<br />

High<br />

High-High<br />

High Particulate<br />

Count<br />

High-High Particulate<br />

Count<br />

High Radon<br />

High-High Radon<br />

Low Sample Flow to<br />

Stack<br />

Operator Action<br />

Operator Action<br />

(291<br />

Operator Action<br />

Operator Action<br />

(25, 26)<br />

Operator Action<br />

Operator Action<br />

Operator Action<br />

(38) 8t<br />

Operator<br />

Actiont4<br />

Operator Action<br />

Operator Action<br />

Operator Action<br />

l4Once the PVS fans have been shut down, operations personnel will observe the particulate level in<br />

the stack. 'If it is still too high, they will also shut down the Pneumatic Retrieval Blower (if<br />