02.03.2013 Views

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.1.2 Emission Control During Retrieval, Transfer, and Packaging<br />

~~ 40430-Pt-0005,Rev;<br />

Silo 3 Environmental Control Plan<br />

-e--<br />

0<br />

-<br />

Jacobs Project Number 35H19605<br />

September 23, 2003<br />

Particulate and radon emissions from retrieval, transfer, and packaging operations are<br />

collected by the PVS, pneumatic retrieval system, and HVAC systems, which are<br />

described in the Process Description (Doc. No. 40430-RP-0003). The expected emissions<br />

from these operations and the resulting <strong>of</strong>f-site impact are summarized in Section 2.2 <strong>of</strong><br />

this document.<br />

The total design airflow for the PVS is approximately 5,500 standard cubic ft per minute<br />

(scfm). Gases from the following sources are transferred to the PVS:<br />

Silo 3,<br />

0 Vacuum Wand Enclosures (ENC-10-5020 A-F),<br />

0 Retrieval Bin Register (EAR-1 1-50521,<br />

0 Excavator Room Register (EAR-1 1-50531,<br />

Inclined Conveyor (DFC-11-50561, and<br />

Packaging Stations A & B Exhaust Registers A & B (EAR-25-5290A&B).<br />

Each <strong>of</strong> these sources are described in Section 4.2 <strong>of</strong> the Process Description (Doc. No.<br />

40430-RP-0003).<br />

2.1.3 Ambient Monitoring<br />

As detailed in Section 3.1 <strong>of</strong> the Fluor Fernald's Silos Project Environmental Monitoring<br />

Plan, monitoring and reporting <strong>of</strong> emissions from the Silo 3 Project will be accomplished<br />

through a combination ambient radon and particulate monitoring and project-specific stack<br />

monitoring.<br />

2.2 ESTIMATED POINT SOURCE AIR EMISSION DATA<br />

The Stack Release Considerations for the Silo 3 Project calculation (Doc. No. 40430-CA-<br />

0003) provides estimates <strong>of</strong> the anticipated air emissions from operation <strong>of</strong> the Silo 3<br />

Project. As described in the preceding sections, the emissions from various sources within<br />

the Silo 3 facilities are collected and discharged through the monitored exhaust stack after<br />

filtration. Table 2-1 summarizes expected emissions from the Silo 3 Exhaust Stack (STK-<br />

19-5209) for both Phase I Pneumatic Extraction and Phase II, Mechanical Extraction. The<br />

Silo 3 exhaust stack is equipped with an air particulate monitor and a continuous radon<br />

monitor.<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!