Timed Estimate <strong>of</strong> Secondary Waste for the Silo 3 Project<br />

Document No. 40430-RP-00 12, Rev. 0<br />

JE Project No. 35H19605<br />

July 1 1,2002<br />

a . . , :, -<br />

5069<br />

$ ,j., it**.;<br />

.c<br />

Six 35 percent supply pre-filters from a 2 x 3 array will be changed out every month<br />

for 6 months.'<br />

Six 90 percent final filters from a 2 x<br />

months.'<br />

Six HEPA filters from a 2 x 3 array will<br />

Six ULPA filters from a 2 x 3 array<br />

campaign. '<br />

3 array will be changed out every month for 6<br />

be changed out every month for 6 months. '<br />

will be changed out at the end <strong>of</strong> the MRS<br />

A total <strong>of</strong> 80 fabric filter bags plus a 5 percent allowance for changeout during<br />

operations will be disposed <strong>of</strong> at the end <strong>of</strong> the MRS campaign.<br />

The PPE and respirators used for packaging system operations are included in PRS and<br />

MRS activities.<br />

2.5 Process /Decon Water<br />

The following assumption applies to the Process/Decon Water System for the amount<br />

secondary waste generated:<br />

e An allowance <strong>of</strong> 5000 gallons for decon water for the duration <strong>of</strong> the project<br />

included in the estimate.<br />

2.6 Compressed Air Systems<br />

The following assumptions apply to the Compressed Air Systems for the amount<br />

secondary waste generated:<br />

Inlet filters for air supply will be changed out biweekly for 1 year.<br />

An allowanee <strong>of</strong> 3 ft3 is included in the estimate for desiccant and adsorbent.<br />

2.7 HVAC System<br />

I<br />

The following assumptions apply to the HVAC System for the amount <strong>of</strong> secondary waste<br />

generated:<br />

Six 35 percent supply pre-filters will be changed out at the end <strong>of</strong> 6 months.<br />

Six 90 percent final filters will be changed out at the end <strong>of</strong> 6 months.<br />

_. . --- -<br />

Six HEPA filterswill be changed out at the end <strong>of</strong> 1 year.<br />

Six ULPA filters will be changed out at the end <strong>of</strong> 1 year.<br />

Three inlet filters for the air-handling units will be replaced on a biweekly basis for 1<br />

year.<br />

' PVS Filter Trains are operated on alternate months<br />

. . -<br />

,.- 1 1 .. (. b ! '<br />

. . ._<br />

<strong>of</strong><br />

is<br />

Of<br />

- . -<br />

000242,

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!