Process Control Plan for the Silo 3 Project<br />

Document No. 40430-PL-0003, Rev. 1<br />

Jacobs Project Number 35H19605<br />

September 5, 2003<br />

WJACOBS . . t- 5069<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

9.<br />

10.<br />

FEMP, 2003a. Process Description for the Silo 3 Project, Document No. 40430-RP-<br />

0003, Revision 1, July 2003a.<br />

FEMP, 2002a. Access and Retrieval Strategy for the Silo 3 Project, Document No.<br />

40430-PL-0002, Revision 0, July 1 1, 2002a.<br />

FEMP, 2002b. Design Basis and Requirements Document, Document No. 40430-DC-<br />

0001, Revision 0, February 2002b.<br />

Jacobs Engineering, 2002. "Fernald Silos 1 and 2 Project Equipment, Pipe, Valve,<br />

and Instrument Numbering," Procedure No. FF-103-01, Revision 2, May 10, 2002.<br />

FEMP, 2003b, Silo 3 Project Equipment fist, Document No. 40430-LST-0001,<br />

Revision 3, June 2003b.<br />

FEMP, 2003c, Piping fine List for the Silo 3 Project, Document No. 40430-LST-003,<br />

Revision 3, June 2003c.<br />

FEMP, 2003d, Piping Valve List for the Silo 3 Project, Document No. 40430-LST-<br />

006, Revision 3, June 2003d.<br />

FEMP, 2003e, lnstrument List for the Silo 3 Project, Document No. 40430-LST-<br />

0002, Revision 2, April 2003e.<br />

FEMP, 2003f. Silo 3 Conditlbning Repor?, Document No. 40430-RP-0025, February<br />

2003f.<br />

Jenike & Johanson Inc., 2002. Pretreatment <strong>of</strong> Silo 3 Material with Lignosulfonate<br />

Solution, 4584-1, August 2002.<br />

13-1