Silos Project Environmental Monitoring Plan<br />

40000-PL-0010<br />

August 29, 2002<br />

5 n 5 9<br />

. f This project-specific environmental monitoring plan considers the location <strong>of</strong> the projects with -.<br />

w<br />

c 2' .'<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

( 18<br />

. 19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

33<br />

34<br />

35<br />

36<br />

.. * 37<br />

.-. _.<br />

respect to other remediation activities [e.g. the Waste Pit Remedial Action Pian (WPRAP)<br />

project] and the FEMP boundary. The plan also considers project-specific constraints such as<br />

the contaminants <strong>of</strong> concern; the characteristics <strong>of</strong> the OU4 wastes; and the material transfer,<br />

handling, and storage processes. Project-specific emission modeling <strong>of</strong> both normal and upset<br />

conditions have provided the basis for identifying and instituting process emission controls that<br />

are protective to the workers, public, and the environment (References 6 and 7). The<br />

effectiveness <strong>of</strong> the project-specific emission controls will be evaluated through analysis <strong>of</strong><br />

monitoring results to identify whether increased or altered emission control methods are<br />

necessary. Project-specific environmental monitoring summary results will be provided in<br />

project completion reports.<br />

1 2 3.1 Environmental -. Radiological Air Emissions Monitoring<br />

1 3 Environmental radiological air monitoring for the Silos Projects will -consist <strong>of</strong> three programs:<br />

14 1 ) Project-specific stack monitoring programs; 2) the IEMP air monitoring program (primarily<br />

15 property boundary and general site areas) including the environmental radon monitoring<br />

16 network; and 3) the Silos area project-specific air monitoring program (within the Silos project<br />

' 7 area boundary).<br />

3.1.1 Project-Specific Stack Monitoring Program<br />

The Silo 3 and Silos 1 and 2 AWR Project stack monitoring requirements are described in the<br />

RD Packages for the projects. Radiological contaminants represent the primary contaminants<br />

<strong>of</strong> concern, therefore the focus <strong>of</strong> stack air monitoring will be for radionuclides; however,<br />

monitoring for other contaminants <strong>of</strong> concern will be added, as warranted. Stack monitoring<br />

for the Silos 1 and 2 project will be addressed in the Silos 1 and 2 RD Package. All three<br />

projects will deploy isokinetic sampling for particulate radionuclides, monitoring, and recording<br />

<strong>of</strong> stack exhaust that is compliant with Title 40 <strong>of</strong> the Code <strong>of</strong> Federal Regulations (CFR), Part<br />

61, Subpart H, and DOE Order 5400.5, Section IV.6.B.<br />

Additionally, the stack exhaust will be continuously monitored for radon to verify that<br />

emissions are controlled such that fence line radon concentrations remain below 0.5 pCi/L, as<br />

an annual average above background. Exhaust Stack radon concentration data from this<br />

monitor will be modeled to determine the resulting fenceline radon concentration and verify<br />

compliance with the annual average 0.5 pCi/l above background fenceline criterion.<br />

Actual ambient concentrations measured by the fenceline and <strong>silo</strong> area radon monitors will be<br />

used to verify the modeling results. These measurements will be compared to historical<br />

baseline data to identify any trends (Le., increased fenceline concentrations) potentially<br />

resulting from Silos Project operations. Data from the background monitors specified in the<br />